SOEST Ocean Gliders (SOG)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa
»
Lab Home
Home
About
Data
Gliders ▼
114
115
139
145
146
147
Photos
Model
Calibration
Guides
SG139 Deployment History:
MIA SeaGliders
(SOEST - PacIOOS)
Mission 10:
Data
Calibration
sg_calib_constants
Health
General
Energy
Location
Config.
Plots
T-D-S-O
General
9/14/12
Last known position (via ARGOS): 30.341 N, 166.133 W
5/22/12
Stopped communicating
5/21/12
Deployed S. of Oahu (
PacIOOS
)
Apr 12
Refurbished at SOEST Ocean Gliders Facility
Mission 9:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Location
Config.
Plots
T-D-S-O
General
Contours
T-S-O-C
Backscatter
5/26/11
Recovered S. of Oahu by R/V
Klaus Wyrtki
- Problem with pitch mechanism
-
deployed: 52 days
5/24/11
Went into Recovery mode after dive 436 due to the failure of the linear potentiometer on the pitch mechanism
4/5/11
Deployed S. of Oahu (
PacIOOS
)
Mar 11
Refurbished at SOEST Ocean Gliders Facility
Mission 8:
Data
Calibration
sg_calib_constants
Trim
SBE Temperature
SBE Conductivity
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Location
Config.
Plots
T-D-S-O
General
Contours
T-S-O-C
Backscatter
11/10/10
Recovered S. of Oahu by OTG Safe boat
- nearing end of battery life
-
deployed: 107 days
7/27/10
Deployed S. of Oahu by Pier 45 Boston Whaler (
PacIOOS
)
July 10
Refurbished at SOEST Ocean Gliders Facility
Mission 7:
Data
Calibration
sg_calib_constants
Trim
SBE Temperature
SBE Conductivity
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Config.
Plots
T-D-S-O
General
Contours
7/14/10
Recovered off Mamala Bay by Boston Whaler
- nearing end of battery life
-
deployed: 94 days
6/13/10
Dive 514: Disabled WET Labs BB2F-VMG sensor (470nm blue, 700nm red & Chloro) to conserve power
4/12/10
Deployed S. of Oahu by Pier 45 Boston Whaler (
PacIOOS
)
- Test case for "wild life" ARGOS backup positioning device
Oct 09
Arrived back from UW
Mission 6:
Data
Calibration
sg_calib_constants
SBE Temperature
SBE Conductivity
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Config.
Plots
T-D-S-O
General
Contours
5/28/09
Shipped to UW for evaluation & recalibration
5/22/09
Recovered by Fisherman
- Problem with pitch mechanism. SG couldn't pitch to an angle appropriate for communication.
5/6/09
Lost
- Searched by R/V
Klaus Wyrtki
. Used pinger to try and get slant range. No response from SG.
5/5/09
Stopped communicating
-
deployed: 46 days
3/20/09
Deployed off Barber's Point by
Force
(
PacIOOS
)
Mission 3:
Data
Calibration
sg_calib_constants
Trim
SBE Temperature
SBE Conductivity
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Config.
Plots
T-D-S-O
General
Contours
3/5/09
Replaced GPS & coin cell battery
2/16/09
Recovered off Kahe Point by R/V
Kilo Moana
during HOT-209
- problem with GPS "engine"
-
deployed: 13 days
2/3/09
Deployed off Barber's Point by
Force
(
PacIOOS
)
1/3/09
Arrived back from UW
Mission 2:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Config.
Plots
T-S
General
Contours
10/21/08
Shipped to UW for recalibration & battery replacement
8/20/08
Recovered by R/V
Klaus Wyrtki
- nearing end of battery life
-
deployed: 42 days
7/9/08
Deployed S. of Oahu
(
PacIOOS
)
Mission 1:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
SBE 43F Oxygen
WetLabs BB2FVMG
Health
General
Energy
Config.
Plots
T-S
General
Contours
5/5/08
Recovered by Fisherman
-
deployed: 14 days
4/21/08
Deployed S. of Oahu
4/9/08
Checkout off Waikiki
12/6/07
Arrived from UW (NOTE: insurance replacement for
sg115
)
Home
About
Data
Photos
Model
Calibration
Guides