SOEST Ocean Gliders (SOG)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa
»
Lab Home
Home
About
Data
Gliders ▼
023
148
500
511H
511K
512
513H
513K
523
626
OTEC
Photos
Model
Calibration
Guides
SG511 Deployment History:
Acoustic SeaGliders
(B. Howe)
Mission 14:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
2/25/13
Recovered S. of Oahu
- end of mission
-
deployed: 4 days
2/22/13
Deployed S. of Oahu
- test deployment of experimental pH sensor
Jan 13
Refurbished at SOEST Ocean Gliders Facility
Mission 13:
Data
Calibration
sg_calib_constants
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
8/3/12
Recovered S. of Oahu
- end of mission
-
deployed: 3 days
8/1/12
Deployed S. of Oahu
- test deployment of experimental pH sensor
Jul 12
Refurbished at SOEST Ocean Gliders Facility
Mission 12:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
11/4/11
Recovered W. of Oahu
- end of mission
-
deployed: 6 days
10/30/11
Deployed S. of Oahu
Mission 11:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
9/16/11
Recovered W. of Oahu
- end of mission
-
deployed: 5 days
9/12/11
Deployed W. of Oahu
Mission 10:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
9/9/11
Recovered W. of Oahu
- end of mission
-
deployed: 4 days
9/6/11
Deployed W. of Oahu
Mission 7:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
9/1/11
Recovered W. of Oahu
- end of mission
-
deployed: 3 days
8/30/11
Deployed W. of Oahu
Jul 11
Refurbished at SOEST Ocean Gliders Facility
Mission 5:
Data
Calibration
sg_calib_constants
Trim
Pressure
SBE Temp. & Cond.
Health
General
Energy
Location
Config.
Plots
Contours
3/5/11
Recovered S.-E. of Taiwan by R/V Roger Revelle
- end of battery life
-
deployed: 94 days
2/17/11
Went into Recovery mode during dive 392 due to "10v voltage cutoff"
11/16/10
Deployed S.-E. of Taiwan by R/V Roger Revelle
10/22/10
Shipped to Taiwan for Philippine Sea 2010 mission
10/8/10
Arrived back from iRobot
Mission 4:
Data
9/22/10
Shipped to iRobot for evaluation/repairs
9/8/10
Recovered S. of Oahu
- VBD problems
9/8/10
Test launch S. of Oahu
1/5/10
Arrived from iRobot
Home
About
Data
Photos
Model
Calibration
Guides