TRAWL: Chief Scientist Report


Chief Scientist: T HOULIHAN


Cruise Plan
Recovery of lost equipment
3-5 June 1996

Cruise Chief Scientist:	Terrence Houlihan
			houlihan@soest.hawaii.edu
			956-3312


I.	Objectives

1.      To recover equipment lost on 8 Feb 1995 at 23 18.00 N and 
	158 3.37 W. The equipment consists of:

	3460 lb in water anchor
	131 lb trap and bridle
	90 lb of 600m plastic jacketed wire
	50 lb of chain
	112 lb of 2 releases
	+250 lb of flotation in 5 hardhats

	for an approximate negative 133 lb not including the anchor.
	This will require use of the trawl winch, large lead weight,
	appropriate chain and shackles.

2.	Any other work that may come up but not limited to
	collecting water for Albert Colman.



II.  Schedule

1.	0800, 2 June: personnel required on board
2.	0830, 2 June: EID for lost equipment station
3.	2230, 2 June: ETA at station			14hrs
4.	2230, 2 June: commence recovery operations
5.	1830, 3 June: end recovery operations		20hrs
6.	1830, 3 June: collect water for A. Colman
7.	2000, 3 June: end water collection		1.5hr
8.	2000, 3 June: EID for Snug Harbor
9. 	0800, 4 June: ETA at Snug 			12hrs



III.  Personnel

1.	Terrence Houlihan,  UHM, Chief Scientist
2.	Albert Colman,  UHM
3.	Lance Fujieki, UHM
4.	Don Wright, UHM
5.	Andrea



IV.	Major Equipment

1.	Large capstan
2.	Large trawl winch
3.	Chain, shackles and large lead weight for grappling array
4.	Grappling hooks
5.	Benthos deck box and hull mounted transducer



We arrived on station at 2030 and started the triangulation.  We
enabled release 702, the same one as last time, and began to collect
slant ranges.  We finished the survey at 2130 and we calculated the
traps to be at the same location as when we checked on HOT 71.  We
relocated to that position and tried to release the array.
Confirmation for release was received from both releases but there was
no indication that the equipment had left the bottom.  We then decided
to go ahead with the deployment of the grappling array at 2240.  The
trawl winch was run at top speed, 60m/min.  Albert was able to start
his water collection during the lowering.

The winds were 6-8 knots from almost due east and practically no swell,
we even saw a fair amount of trichors.  It must be due to the small
party but Paul set us up with steak, cooked to order, and lobster for
dinner.  Paul also caught a good sized Ono on our way out so that is
supposed to be on the menu.

We started recovering the wire about 0155 with an average tension of
7Klb.  During recovery the tension reached a max of 13Klb.  By 0430 we
had the grappling hook array on deck and it had wrapped up on itself,
possibly due to snapping back from the large jump in tension, quite a
mess but Luigi and Dave took care of it, no problem.  About 120m of
wire was dumped overboard and we reattached the hooks and proceeded to
the starting point for another attempt.

Weather and seas are still being very cooperative, makes everything
that much easier, winds are below 5 knots.  Got to like those light and
variables, lots of trichos yet.  Al still collecting samples.

Started the second attempt at 0545 with deployment of hooks and weight
with the weight going overboard at 0630.  We should get one more good
try and see how things go from there.

Because of the problems encountered on the first try we recovered the
second attempt to the point where we could be sure that the hooks were
not fouled and this was finished at noon on Tuesday for a total
deployment time of 6.5 hr. (The hooks were attached to the hydrowire
with about 20 meters between them and the 2000 LB lead weight was
attached 20 meters above the top hook.  On this and subsequent attempts
we had way on as the hooks reached the bottom to ensure that the anchor
would not end up on top of the hooks.) There was a tensiometer spike of
13K lb. on the second attempt also.  On the third attempt we changed
tactics somewhat.  Rather than pay out wire around the target to a
point 3/4 of the way around and then cruise away at an a 90 degree
angle tangent to the circle we only paid out wire to a point just over
halfway on the circle and from that point headed 90 degrees away from
the circle.  The first method was designed to drag the wire over the
package on the assumption that the glass balls would be released from
the anchor which would have allowed the wire to catch on any vertical
relief.  The second method was used to try to get the hooks to catch on
the package itself as we straightened out the loop.

The third attempt was begun at noon and after it was determined that we
didn't hook the target we returned to the starting point and began
attempt 4. The hooks were only brought to 3800 m on the third attempt
to save time.  The fourth attempt was brought on board and we secured
the back deck by 1930 for the transit to Snug.  Both the third attempt
and the fourth attempt had jumps in the tension on the line and two of
the hooks indicated that something had been hooked.

We continued to have favorable weather throughout the operation, no sea
swell and winds less than 10 knots.  The mates were very helpful in
navigating the ship and contributing suggestions for alternative
plans.  Luigi and Dave had the back deck operation down to really speed
up the turnaround between attempts.  Confirmation on the release of
both releases was received six times and the slant range signal was
good also.  We seemed to have everything going for us but were still
not able to recover the equipment.  It may have been beneficial to
spend another day on station and that was brought up but without clear
approval from the PI's, considering the resources already invested and
the good conditions we had it was decided to return to port without the
gear.