Chief Scientist: L. TUPAS


Loading: September 25, 1998		Chief Scientist: Dr. Louie Tupas
Departed: September 26, 1998 at 0900	Master: Captain John Stahl
Returned: September 30, 1998 at 0800    Deck Operations: Mr. Dave Gravatt
Vessel: R/V Moana Wave                  Electronics Technician: Mr. Steve Poulos

1. SCIENCE PERSONNEL

 Luis Tupas - UH, JGOFS
 Dale Hebel  UH JGOFS
 Karin Bjorkman - UH, JGOFS
 Terrence Houlihan - UH, JGOFS
 Lance Fujieki - UH, JGOFS
 Scott Nunnery - UH, JGOFS
 Stephanie Christensen  UH, JGOFS
 Dan Sadler - UH, JGOFS
 Craig Nosse - UH, WOCE
 Don Wright - UH, WOCE
 Fernando Santiago Mandujano - UH, WOCE
 Mark Valenciano  UH, WOCE
 Brian Popp - UH, Scientist
 Markus Karner  UH, Post-doc
 Ken Smith  SIO scientist
 Roberta Baldwin  SIO Technician
 Robert Glatts - SIO, Tehcnician

2. GENERAL SUMMARY

 All objectives of the JGOFS and WOCE programs were accomplished. All
planned stations were occupied. All core samples were taken and the 36
hour CTD burst sampling period was not interrupted. All samples for
ancillary projects were taken. Floating sediment trap array and primary
production array deployed and recovered successfully. No samples were
lost during the in-situ incubations. ADCP measurements were made
throughout the cruise. Ken Smiths free vehicle grab respirometer was
successfully deployed and retrieved. Maintenance work on the ARGOS
transmitter on HALE ALOHA was accomplished.

3. R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT

 The R/V Moana Wave continues to maintain the excellent ship support for
our work. The officers and crew were most helpful and accommodating.
They showed enthusiasm and concern for our work and were very flexible
in receiving changes in our operational schedule. Technical support
during this cruise was excellent. STAG personnel were available at any
time to assist in our work and made things much easier for us.

4. DAILY REPORT OF ACTIVITIES

September 25, 1998; Loading Day

 The ship arrived from a cross eastern Pacific cruise. The ship was
cleared prior to our loading. All deck and lab equipment were moved from
either SNUG Harbor labs or UH on this day. All electrical and electronic
connections were made for the CTD. All lab equipment were stowed away
and secured. All laboratory instruments were tested and appeared
functioning. No problems were encountered.

September 26, 1998

We departed from Snug Harbor at 0900 as scheduled without any problems.
Fire and emergency drills conducted at 0930 followed by a safety
briefing by the first mate and a short science meeting. Arrived at
Station Kahe at 1200 and conducted the weight cast to 1000 m and the
PRR/TSRB casts. A CTD cast to1000 meters was made. All samples were
taken and we departed for Station ALOHA at 1600.

September 27, 1998

We arrived 1 mile north of the Station ALOHA circle at 0100. The free
vehicle grab respirometer (FVGR)  was programmed and deployed at 0200.
At 0300 we had returned to the center of the station and deployed the
free floating sediment traps. We departed Station ALOHA for the HALE
ALOHA mooring at 0500 and arrived at 0730. Small boat operations
commenced at 0800 for more available daylight. Terry Houlihan and the
chief mate successfully retrieved the ARGOS transmitter from HALE ALOHA.
They were back on ship by 0830. CTD, trace metal and PRR/TSRB casts were
made starting at 0900. Weather was good, 20 knot winds, 4 foot seas but
very long swells. Transit to Station ALOHA at 1200, arrived at 1400. Net
tow at 1430, CTD casts commenced at 1500, continued every 3 hours.

September 28, 1998

Work continues according to schedule without any problems. Go-Flo cast
at 0200. Primary production experiment made from CTD and Go-Flo cast
water. All Go-Flo bottles have been repaired and in good working
condition. Primary production experiment was deployed without incident.
EOC spikes were performed. At noon we did optical measurements as
scheduled at Station ALOHA. Net tows so far successful and grazing
experiments are underway. Primary  production experiment retrieved at
1900 and all samples processed shortly after. CTD casts continue at 3
hour intervals.

September 29, 1998

We have been receiving ARGOS positions for the sediment trap array. They
have not moved very far. Work has been proceeding as scheduled without
any problems. JGOFS casts completed 0200, all samples taken. WOCE deep
cast completed at 0600. After last cast, ship proceeded to FVGR site.
FVGR retrieved at 0900, transit to sediment traps. Traps retrieved at
1300 and ship proceeded to HALE ALOHA to return ARGOS transmitter with
fresh batteries installed. Arrived at HALE ALOHA at 1500. Proceeded with
zodiac operations, completed at 1700. Started transit to Honolulu at
1800.

September 30, 1998

 Arrived at Snug Harbor at 0800. Unloading commenced immediately and
completed at 1200.

SAMPLES TAKEN FOR OTHER INVESTIGATORS

1. DIC water samples for C.D. Keeling, SIO-UCSD
2. DIC water samples for P. Quay, UW
3. Seawater for E. Laws, UH
4. N2O samples by Brian Popp, UH
5. Phosphorus experiments by Karin Bjorkman, UH
6. Molecular probe experiments by Markus Karner, UH
7. Aerosol and ozone measurements for J. Porter, UH