Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-93: Chief Scientist Report


Chief Scientist: D. HEBEL


                                HOT 93 Cruise Report
                              R/V Moana Wave (MW 9812)
                                  11-15 May, 1998
                              

Personnel List

HOT 93:

WOCE group:
Fernando Santiago-Mandujano   	Research Associate		UH
Craig Nosse*                  	Research Associate		UH
Mark Valenciano           	Electronic Techician		UH
Don Wright               	Research Associate      	UH

JGOFS group:
Dale Hebel                    	Chief Scientist (co-PI JGOFS)	UH
Louie Tupas*             	Scientist (co-PI JGOFS)		UH
Terrence Houlihan        	Research Associate		UH
Lance Fujieki            	Computer Specialist           	UH
Pat Driscoll             	Research Associate            	UH
Markus Karner            	Post-Doc                 	UH
Karen Bjorkman           	Research Associate            	UH
Scott Nunnery            	Research Associate            	UH


Ancillary projects:
Jasmine Bartlett              	Research Associate		OSU
Michael Laline           	Volunteer                	HPU


STAG:
Steve Poulos                    Electronic Technician		UH-UMC
Dave Gravatt                    Deck Technician			UH-UMC

* Watch Leader



Itinerary (approximate HST):
----------------------------

     Monday,  11 May

     0900 Departed Snug Harbor
     0920 Fire/abandon ship drill, science meeting
     1140 Arrived Kahe Pt. (Sta. 1)
     1150 Weight cast (1020 m)
     1250 PRR/TSRB casts (1 light and 1 dark PRR profile)
     1340 s1c1
     1500 Departed Kahe
     
     Tuesday,  12 May

     0010 Arrived Sta. Aloha (Sta. 2)
     0035 Plankton net tow (aborted capstan brake problems)
     0150 Completed sediment trap deployment  (22o45.58N,157o 59.38W)
     0240 s2c1 (WOCE deep)
     0810 s2c2 (WOCE shallow)
     1000 PRR-600 cast
     1020 Plankton net tow (aborted capstan brakeproblems)
     1100 s2c3
     1210 PRR-600/TSRB cast
     1230 Plankton net tow (net fouled)
     1320 Plankton net tow
     1400 s2c4
     1500 PRR-600 cast
     1700 s2c5
     2010 s2c6
     2210 Plankton net tow
     2300 s2c7

     Wednesday,  13 May

     0000 Plankton net tow
     0030 Plankton net tow
     0100 Go-Flo cast
     0200 s2c8
     0430 Deployed primary productivity array (22o45.3N, 157o 59.8W)
     0500 s2c9
     0630 Reterminated CTD cable
     1010 Plankton net tow
     1030 Plankton net tow
     1100 s2c10
     1230 PRR-600/TSRB cast
     1240 Plankton net tow
     1310 Plankton net tow
     1450 s2c11
     1700 s2c12
     1900 Retrieved primary productivity array (22o 46.10N, 157o 58.59W)
     2000 s2c13
     2200 Plankton net tow
     2300 s2c14

     Thursday, 14 May

     0040 Reterminated CTD cable
     0100 Transit to pump tanks
     0350 s2c15 (second WOCE deep cast)
     0930 Floating sediment trap recovery (22o 43.95N, 157o56.37W)
     1040 Transit station 8
     1300 PRR-600/TSRB cast
     1350 Zodiac operations (mooring inspection)
     1410 Zodiac operations complete
     1430 s8c1
     1500 Trace metal sampler deployed
     1610 Departed station 8

     Friday,  15 May
     
     0740 Arrived Snug Harbor
     1130 Completed offloading operations



Narrative:
----------

HOT 93 was conducted aboard the R/V Moana Wave 11-15 May 1998.  Captain
Hayes was the master of the vessel and Dale Hebel chief scientist.
There were a total of 16 participants in the scientific party composed
of 4 WOCE, 8 JGOFS, 2 Ancillary and 2 STAG.  We departed Snug on 11 May
occupying stations at, Kahe Pt.  (sta. 1), Station ALOHA (sta. 2),
and HALE ALOHA mooring location (sta. 8).  CTD operations were
conducted at stations 1, 2 & 8.  Fifteen CTD casts were conducted at
Station ALOHA and one at station 8 in addition to 7 light casts, 6
successful net tows, 1 Go-Flo cast, and usual floating sediment traps
and productivity operations.  All operations were routine with the
exception of the extra light casts requested by Jasmine Bartlett of
OSU.  All underway measurement systems (thermosalinograph, ADCP,
meteorological instruments, pCO2 and fluorometer) were operable and
functioned normal except for a period when it was discovered that the
attitude feed for the ADCP was off-line.  The seas were generally
rough with high winds and mostly cloudy skies.  Due to the rough seas a
number of spikes were recorded in some of the continuous measurement
systems.

(following paragraph contributed by Steve Poulos) Ozone and aerosol
measurements were made in conjunction with the satellite overpass
(name??)  at about noon during the 3 days (May 12,13,14) of station
work.  On May 12 & 14, the satellite passes had elevation angles too
low to be useful for correlation of data.  This along with 60% or more
cloud cover rendered the measurements taken fairly useless.  On May 13,
when the elevation of the satellite was approx 65 degrees, cirrus,
strato cirrus, and cumulus clouds blocked clear visibility of the sun.
During the 1/2 hour pre & post of max elevation time there were only a
couple of short times of clear visibility(also had a squall pass
through).  Again, the conditions would minimize any correlation of the
data with the satellite data.



Daily Activities (HST)

6 May, 1998
HOT 93 pre-cruise meeting MSB 315 at 1130 hrs.

8 May, 1998
Ship loading day.

11 May, 1998 
Departed Snug Harbor 0900 hrs.  After departure at about the mile buoy
we had the routine fire/abandon ship drill followed by a short science
meeting.  Arrived Kahe about 1140 hrs and conducted a 1000 m weight
cast, 2 PRR casts (1 light, 1 dark), TSRB cast and final 1000 m CTD
cast.  All equipment functioned properly and all samples collected.
Skies were mostly sunny with 2-4' seas, 3-4' south swell and winds
10-20 kts.  Departed Kahe ~1500 hrs.


12 May, 1998 
Arrived Station ALOHA ~0015 hrs.  The transit was bumpy with the ship
(and personnel) experiencing significant roll and pitch.  From the ride
it was doubtful that over-the-side work could be initiated, however,
once on station and the ship positioned into the wind over-the-side
operations were possible.  The first operation a plankton tow was
aborted due to a problem with the capstan.  As is usually the case the
capstan worked properly to the point where the net was in the water and
being let out, then a pop was heard and the brake seized.  We were able
to retrieve the net but the cast could not be completed.

The sediment trap array was deployed, however, when the hard-hat tag
line was released the hard-hats were pulled into the floating bobber
line and under the spar buoy.  It was feared that the hard-hats may
have entangled the spar buoy but on closer examination from the ship's
bridge it appeared that the spar buoy and bobber assembly were floating
properly.  During the recovery it was found that the line had entangled
the spar buoy.

Seven CTD casts were completed including s2c1 (WOCE deep), s2c2 (WOCE
shallow), s2c3 (PC/PN), s2c4 (PPO4), s2c5 (JGOFS-1), s2c6 (JGOfS-2),
and s2c7 (salts).  Three light casts were completed at ~1000hrs, 1230
hrs, and 1530 hrs.  Due to rough seas the CTD hit the side of the ship
on s2c3 (no damage resulted).  The second net tow also experienced the
same brake problem and was also aborted, again with the net in the
water.  At this point the brake was completely disabled for the next
scheduled net tow.  During the next tow (~1400 hrs), the net was
deployed but when retrieved was fouled.  Another tow was tried and was
successful.  The scheduled tow at ~2200 hrs was also successful.

Skies were mostly sunny with brisk Trades 15-25 kts, and seas 4-8'.


13 May 1998 
Completed 7 net tows (most sucessful), Go-flo cast and 7 CTD casts
through s2c14.  Problems developed with another kink in the CTD cable
due to twisting (??)  which required retermination and removal of 300 m
of CTD cable.  This occurred just before s2c10 causing a delay in
scheduled operations by one cast.  After the retermination CTD
operations continued without problems until the last 1000 m cast where
another kink developed and retermination required before the second
deep cast at Station ALOHA.  During the recovery of s2c11 the bottom of
the CTD frame hit the bottom board on the A-frame passage-way breaking
the board but no damage to CTD array.  Other operations (net tows and
light casts) have been completed without incident.  The primary
productivity array was successfully deployed and retrieved with no
samples lost.  Except for few lingering cases of seasickness all
personnel were well and functioning.

The winds continued to blow Trades at 20-30 kts with 6-8' swells and
mostly cloudy skies.


14 May 1998 
After the second deep cast (s2c15) we transited to the sediment traps
(slowly heading southeast), and recovered the traps without incident
although the spar buoy was entangled and riding low in the water.
En-route to station 8 for the final 1000 m cast we stopped around noon
for a final light cast.  At station 8 we conducted a zodiac operation
(Houlihan and Barns) to inspect and secure some of the damaged
components on the mooring resulting from the recent deployment. We
departed station 8 approximately 1600 hrs for Honolulu after completing
and sampling s8c1.

Weather conditions remain the same.


15 May 1998 
Arrived Snug Harbor 0740 hrs.  Offloading was completed before noon.



Weather:
--------

HOT 93:  The weather was mostly cloudy with high winds and rough seas.
Below is listed the cruise bridge log descriptions and the various
values represent the range for that day.  Under wind, sea, and swell
there will be two designations, the first is the direction (in
degrees), the second for wind is in kts, sea in Beauford force, and
swell in feet, barometer in inches of Hg, temp C (dry bulb) and clouds
in tenths.

Day  Date    Wind            Sea       	  Swell	       Barometer   Temp  Clouds

Mon  11 Mar.  045-080,12-28  045-080,3-4  050-100,3-8  30.09-30.16  72-84  5-7
Tues 12 Mar.  050-070,22-25  050-070,4    070-090,4-8  30.08-30.14  72-77  5-7
Wed  13 Mar.  070-075,21-28  070-075,4    080,6-8      30.06-30.13  71-75  4-10
Thur 14 Mar.  070-090,20-30  070-090,4-5  080,8	       30.08-30.14  73-77  8-10
Fri* 15 Mar.  070-080,10-16  070-080,2-3  080-100,2-3  30.05-30.06  73-74  7

*Only two entries  (0200 & 0600 hrs)



Equipment and methods:  
---------------------- 
All standard equipment functioned properly.  Two reterminations of the
CTD cable were made and the CTD array hit the side of the ship on two
occasions.


Sub component programs:
-----------------------

Investigator:                      Project:
-------------                      --------

Christopher Winn (UH)         	DIC, pH, Alk., pCO2/UH
Bob Bidigare (UH)               HPLC pigments/UH
Michael Landry (UH)           	zooplankton dynamics/UH


Ancillary programs:
-------------------

Investigator:                      Project:
-------------                      --------
Charles Keeling (SIO)           CO2 dynamics andintercalibration/SIO
Paul Quay (UW)                	DIC and 13C/UW
Ed Boyle            		trace metals/MIT
John Porter              	aerosols


Students:
---------

Others:
-------
Karin Bjorkman           	phosphorus experiments/UH
Dale Hebel               	EOC measurements/UH
Markus Karner            	molecular probe samples/UH
Jasmine Bartlett             	optics/OSU