Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa |
| » Home » Cruise Schedules, Reports & Cast Sheets » HOT-88 CS Report | |
HOT-88: Chief Scientist ReportChief Scientist: D. HEBEL
HOT 88 Cruise Report
R/V Moana Wave
3-7 Dec., 1997
Personnel List
HOT 88:
WOCE group:
Fernando Santiago-Mandujano* Research Associate UH
Craig Nosse Research Associate UH
Hans Ramm Research Associate UH
Don Wright Research Associate UH
JGOFS group:
Dale Hebel Chief Scientist (co-PI JGOFS) UH
Louie Tupas* Scientist UH
Chris Carrillo Graduate Student UH
Stuart Donachie Post-Doc UH
Terrence Houlihan Research Associate UH
Lance Fujieki Computer Specialist UH
Pat Driscoll Research Associate UH
Markus Karner Post-Doc UH
Stephanie Christensen Graduate Student UH
Ancillary projects
Ken Smith Scientist SIO
Roberta Baldwin Research Associate SIO
Alfred Uhlman Research Associate SIO
Robert Glatts Research Associate SIO
STAG
Steve Poulos Electronic Technician UH-UMC
Dave Gravatt Deck Technician UH-UMC
* Watch Leader
Itinerary (approximate local time):
----------------------------------
Wednesday, 3 December
0910 Departed Snug Harbor
0940 Fire and Abandon ship drill, science meeting
1150 Arrived Kahe Pt. (Sta. 1)
1210 PRR-600 cast
1310 s1c1
1420 PRR-600 cast
1430 TSRB cast
1530 Practice rough water CTD deployment/retrieval
1610 Departed Kahe
Thursday, 4 December
0730 Arrived Aloha (Sta. 2)
0900 Arrived FVGR deployment site (22o 52' N, 158o W)
1130 Plankton net tow
1320 FVGR deployed
1440 s2c1
1800 s2c2
2100 s2c3
2220 Plankton net tow
Friday, 5 December
0000 s2c4
0120 Plankton net tow
0300 s2c5
0600 s2c6
0900 s2c7 canceled (CTD cable reterminated)
1040 Plankton net tow
1150 PRR-600 cast
1210 TSRB cast
1220 Plankton net tow
1240 Transit ROVER deployment site
1400 ROVER deployed
1510 s2c7
1910 s2c8 (WOCE deep cast)
2250 Plankton net tow
Saturday, 6 December
0200 s2c9
0650 Recovered FVGR (22o 51.5'N, 158o 01.0' W)
1000 s8c1
1150 PRR & TSRB casts
1230 Acoustic release operations
1420 Release code sent and verified using Scripps transducerand deckbox
1450 Hardhats spotted
1515 Began HALE ALOHA recovery
2000 Completed HALE ALOHA recovery
2010 Weight cast 1000 m (crush cup operation)
2050 Departed station 8
Sunday, 7 December
0700 Arrived Snug Harbor
1130 Completed offloading operations
Narrative:
----------
HOT 88 was conducted aboard the R/V Moana Wave 3-7 December 1997.
Captain Hayes was the master of the vessel and Dale Hebel chief
scientist. There were a total of 19 participants in the scientific
party composed of 4 WOCE, 9 JGOFS, 4 ancillary and 2 STAG. This was a
two-segment cruise. The first segment of the cruise was to recover
both the HALE ALOHA mooring and the bottom moored sediment traps and
the second segment the routine HOT cruise. The first phase which was
scheduled for two days was canceled by the chief scientist Terrance
Houlihan on the first day due to high winds (gusts over 40 kts) and
rough (unworkable by captains standard) seas. This cruise returned to
Snug Harbor by 0800 hrs on 2 December. We departed Snug on 3 December
for HOT 88, although the winds were predicted to remain high throughout
the week. Due to the rough sea conditions we decided to delete the
floating sediment trap and OPC operations. In addition to the regular
HOT scientific contingency, we had four scientists aboard from SIO to
deploy 2 benthic respirometers (FVGR & ROVER). Four stations were
occupied during HOT 88, Kahe Pt. (sta. 1), Station ALOHA (sta. 2),
FVGR/ROVER deployment site, and HALE ALOHA mooring location (sta. 8).
CTD operations were conducted at stations 1, 2 & 8. Nine casts were
conducted at Station ALOHA and one at stations 1 & 8. During the
cruise all underway measurement systems (thermosalinograph, ADCP,
meteorological instruments, pCO2 and fluorometer) were operable and
functioned normally except for a period when the feed water was turned
off due to air in the lines from the rough seas on our outward transit.
The seas were rough, throughout the cruise, with sustained winds 20-30
kts and gusts over 40 kts, swells 5-15 feet and mostly cloudy skies.
Daily Activities (HST)
21 Nov. 1997
Pre-cruise meeting MSB 315 at 1030 hrs.
28 Nov. 1997
Equipment for the Recovery cruise and most of the equipment for the HOT
cruise were loaded and tested. The remaining equipment was loaded on
Wed. 3 Dec.
3 Dec. 1997 (Wednesday)
All science personnel were aboard by 0830 hrs and the ship departed on
schedule (~0900 hrs.), however due to channel traffic, we were delayed
about 1/2 hr. Abandon ship, fire and science meeting was conducted
about 1000 hrs. Arrived Kahe ~1200 hrs and conducted PRR cast, 1000 m
CTD cast, TSRB cast and 4-5 practice rough weather CTD
deployment/retrievals. It was found that the 2 tags using hooks and
poles was preferable to the 3-man tag system outlined in the CTD
deployment/retrieval protocols. Departed Kahe ~1630 hrs. The winds
were blowing ~20 kts, seas ~3-5', and skies mostly cloudy.
4 Dec. 1997 (Thursday)
We reached the circle center of ALOHA (~0730 hrs HST), after steaming
most of the night between 4-6 kts. The seas were very confused and the
wind was blowing an average 30 kts with higher gusts. Ken Smith
thought he would be able to deploy the FVGR at the proposed location
7nm north of the circle center. We headed to that local to assess the
situation. The feed water for the uncontaminated flow-thru system was
turned off 3 Dec. at ~1900 hrs due to air in the system because of the
rough sea conditions.
After arriving on station the captain decided there would be no
over-the-side work at this time. The captain expected the sea and wind
conditions to remain the same through Friday. About an hour or two
after the captain decided there would be no over-the-side operations he
held a meeting with myself, Ken Smith and Dave Gravatt to discuss the
potential deployment/retrieval of the FVGR. He emphasized that if Ken
wanted to deploy the vehicle that he could not guarantee it could be
recovered and the decision to deploy would be up to Ken. Ken decided
to deploy the vehicle. Prior to the FVGR deployment Stephanie did a
net tow and one later that night. Observation, if net tows can be
conducted successfully then CTD and other over-the-side operations are
usually possible.
Following the FVGR deployment, which went without incident, we steamed
back to the center of the circle and began CTD operations.
5 Dec. 1997 (Friday)
At the end of the day on Friday we had completed JGOFS 1 & 2, HPLC,
PC/PN, PPO4, N20/CH4, PSi, ATP and WOCE 1 & 2 CTD casts, 4 net tows, 2
PRR/TSRB casts, and deployment of the ROVER. The FVGR was programmed
to release at 0500 hrs 6 Dec. and surface by 0700 hrs. The winds on
Friday abated somewhat and were blowing 20-30 kts but a real blessing
was the confused seas, which have resulted from what appears to be two
different swell directions. The result was that the seas were not as
large as they probably would have been allowing us to continue with our
work.
During the 3 hr CTD deployment phase the casts had been going normally
but before deploying the CTD for the ATP cast a kink in the cable was
discovered (by John Stahl, winch operator and first mate), and the
cable reterminated after inspection by the watch leader (FSM).
6 Dec. 1997 (Saturday) After completing the ATP cast sample
collection and CTD work at Station ALOHA was concluded. We proceeded
to the deployment site of the FVGR, which was set to release at 0500
hrs and was expected to surface at 0700 hrs.
Sometime after our arrival 0600-0645 hrs the bridge had the package in
sight and was making its retrieval approach at ~0700 hrs. The recovery
went smoothly and by 0730 hrs we were underway heading for HALE ALOHA.
Upon arrival (~1030 hrs), we did a CTD cast, PRR/TSRB cast, released
the array and recovered the mooring. During the recovery winds were
variable 15-25 (average ~20 kts) out of the NE, skies mostly cloudy,
and seas ~10'.
Weather
-------
The skies were almost always cloudy with high winds and confused seas.
Below is listed the cruise bridge log descriptions and the various
values represent the range for that day. Under wind, sea, and swell
there will be two designations, the first is the direction (in
degrees), the second for wind is in kts, sea in Beauford force, and
swell in feet, barometer in inches of Hg, temp C (dry bulb) and clouds
in tenths.
Day Date Wind Sea Swell Barometer Temp Clouds
Wed. 3 Dec. 035-080, 16-38 040-080, 3-6 040-060, 3-6 30.04-30.12 72-77 6-9
Thurs. 4 Dec. 050-065, 25-36 050-065, 4-6 050-070, 10-15 30.11-30.20 71-72 7-10
Fri. 5 Dec. 050-065, 25-36 050-065, 4-6 050-070, 10-15 30.11-30.16 71-72 6-10
Sat. 6 Dec. 040-060, 22-30 040-060, 4 050, 8-10 30.07-30.11 70-77 6-8
Sun. 7 Dec.* 060, 13 060, 2 050, 4 30.00 73 3
*Only one entry (0200 hrs)
Equipment and methods:
----------------------
Due to rough seas and the recovery of the HALE ALOHA mooring the three
hour burst sampling was restricted to ~25 hrs. All samples were
collected except for H2O2. Keeling's DIC bottles were not aboard
however samples were collected for him in our DIC bottles. Again, due
to the rough seas the primary production and floating sediment trap
experiments were canceled. The OPC was also canceled to allow time for
the mooring recovery.
Sub component programs:
----------------------
Investigator: Project:
------------- -------
Christopher Winn (UH) DIC, pH, Alk., pCO2/UH
Bob Bidigare (UH) HPLC pigments/UH
Michael Landry (UH) Zooplankton dynamics/UH
Ancillary programs:
-------------------
Investigator: Project:
------------- --------
Charles Keeling (SIO) CO2 dynamics andintercalibration/SIO
Paul Quay (UW) DIC and 13C/UW
Ed Boyle trace metals/MIT
Students:
---------
Chris Carrillo Community respirationexperiments/UH
Others:
------
Stuart Donachie Ectoenzyme activities/UH
Markus Karner Microbial fluorescence probes/UH
| |