Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-83: Chief Scientist Report


Chief Scientist: L. TUPAS


Loading: May 2, 1997           Chief Scientist: Dr.Louie Tupas 
Departed: May 5, 1997 at 0930  Master: Captain Robert Hayes 
Returned: May 9, 1997 at 0730  Deck Operations: Mr. Luigi Pozzi 
Vessel: R/V Moana Wave         Electronics Technician: Mr. Steve Poulos

1.      SCIENCE PERSONNEL

Luis Tupas - UH, JGOFS 
Dale Hebel - UH, JGOFS 
Terrence Houlihan- UH, JGOFS 
Karin Bjorkman - UH, JGOFS 
Jefrey Snyder - UH, WOCE
Craig Nosse - UH, WOCE 
Don Wright - UH, WOCE 
Matt Cochran - UH, WOCE 
Pat Driscoll - UH, JGOFS 
Stephanie Christensen - UH, JGOFS
Mai Lopez - SIO 
Stuart Donachie - UH, Post-Doc 
Albert Calbet -UH, Post-Doc 

2.      GENERAL SUMMARY

All objectives of the JGOFS and WOCE programs were accomplished. All
planned stations were occupied. All core samples were taken and the 36
hour CTD burst sampling period was not interrupted. All samples for
ancillary projects were taken. Floating sediment trap array and primary
production array deployed and recovered successfully. No samples were
lost during the in-situ incubations. ADCP measurements were made
throughout the cruise. The pCO2 system was installed and worked using
the ships uncontaminated seawater intake system. The optical plankton
counter was towed around Station ALOHA, however, there were problems
with the CTD. The submersible pump worked continuously during the tow.

3.      R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT

The R/V Moana Wave continues to maintain the excellent ship support for
our work. The officers and crew were most helpful and accommodating.
They showed enthusiasm and concern for our work and were very flexible
in receiving changes in our operational schedule.  Technical support
during this cruise was excellent. STAG personnel were available at any
time to assist in our work and made things much easier for us.

4.      DAILY REPORT OF ACTIVITIES

May 2, 1997; Loading Day

All deck and lab were moved from either SNUG Harbor labs or UH on this
day.  All electrical and electronic connections were made for the CTD
and the OPC/CWS.  The submersible pump was tested and installed inside
the V-fin. The flash flurometer was reinstalled for this cruise . All
lab equipment were stowed away and secured. All laboratory instruments
were tested and appeared functioning. No problems were encountered. The
lowered ADCP had arrived but its configuration inside the CTD frame was
still unresolved.

May 5, 1997

Most scientists arrived on ship by 0830. Two scientists (Hummon & Rowe)
decided not participate on this cruise because the LADCP could not be
properly configured. One scientist (Donachie) had to be picked up at
the university after he missed the scheduled shuttles.  We also had to
wait for the arrival of equipment for Stump and Driscoll. Ship departed
at 0930 after all scientists and equipment arrived. Fire and emergency
drills conducted at 1000 followed by a safety briefing by the first
mate and a short science meeting. Arrived at Station Kahe at 1200.
Conducted weight cast followed by a light cast using the Profiling
Reflectance Refractometer (PRR). A 1000 m CTD cast completed the
operations. Started transit to Station ALOHA at 1600 following a depth
contour of about 500 meters for ADCP bottom tracking.  Uncontaminated
seawater system was run and the pCO2 system was connected and operated.
Rough sea conditions slowed the transit to Station ALOHA and we arrived
at 2330. A net tow was made upon arrival at Station ALOHA.

May 6, 1997

Floating sediment trap array deployment procedures began at 0030 and
accomplished at 0230. The new spar buoy had to be reconfigured with
additional weight to keep the buoy upright. One sediment trap collar
was damaged so only 11 traps were deployed at 150 meters. 3 traps were
deployed at 165 meters. After deployment, the ship transited to center
of station and commenced the WOCE deep cast at 0330. Cast was completed
at 0700. CTD burst sampling commenced at 0830 and maintained at 3 hour
intervals. Zooplankton tows at noon successful. PRR cast successful.

May 7, 1997

CTD casts continued at 3 hour intervals. Go-Flo cast conducted at 0130.
A mistake was made during the dispensing of the C14 isotope. The bottom
four depths had only two light and two dark bottles for incubation.
Primary production array deployment commenced at 0500.  CTD casts
continued at 3 hour intervals. Zooplankton tows conducted at noon. PRR
cast at 1230. Retrieval of primary production array commenced at 1900.
No samples were lost. CTD casts continued at 3 hour intervals.  One
night tow was accomplished. Last 1000 meter cast conducted at 2200.
Last net tow accomplished at 2230. Transit outside the circle to pump
tanks.


May 8, 1997

Returned to center of circle at 0000. Second deep cast started at 0130
and finished at 0500. Started OPC towing at 0500 and completed at 1200.
Transit to sediment trap retrieval site. Retrieval started at 0130,
completed at 1530. The retrieval of the array was made difficult by the
sea and wind conditions. The array drifted under the stern and the down
line had to be retrieved separately to untangle the lines underneath
the ship. All sediment traps were retrieved undamaged and the whole
array was safely and successfully retrieved. Transit to HALE ALOHA.
Cast started at 1800 and completed at 2000. Transit to Honolulu at
2000.

May 9, 1997

Arrived at Snug Harbor at 0730. Proceeded with unloading, completed at
1100.


SAMPLES TAKEN FOR OTHER INVESTIGATORS

1. DIC water samples for C.D. Keeling, SIO-UCSD 
2. DIC water samplesfor P. Quay, UW 
3. Surface seawater for J. Gharib, UH 
4. Surface seawater for A. Thomson, UH 
5. Surface seawater for S. Vink, UH