HOT-72: Chief Scientist ReportChief Scientist: F. SANTIAGO-MANDUJANO
HOT 72 Chief Scientist's Cruise Report
R/V Moana Wave
20-24 May 1996
Departed: May 20, 1996 at 0830 (HST)
Returned: May 24, 1996 at 0800
Vessel: R/V Moana Wave
Operator: University of Hawaii
Chief Scientist: Fernando Santiago-Mandujano
Master: Captain John Stahl
Deck Operations: Pierluigi Pozzi
Electronics Technician: Will Hervig
1. SCIENTIFIC OBJECTIVES
The primary objective of the cruise was to maintain the collection of
hydrographic and biogeochemical data at the Hawaii Ocean Time-series
(HOT) station. The HOT station, also known as Station ALOHA (A Long
Term Oligotrophic Habitat Assessment) is defined as a circle with a 6
nautical mile radius centered at 22o45'N, 158oW. Free-drifting
sediment traps were planned for deployment for approximately 72 hours
from the site to measure sedimentation rates of particulate matter. CTD
casts at three hour intervals were planned to obtain temperature,
salinity, dissolved oxygen and flash fluorescence. Water samples for
analysis of dissolved nutrients, gases, and biomass were to be
collected with the CTD casts. Another free-drifting array to conduct a
primary production experiment was planned for a 12 hour deployment. Two
other stations were planned to be occupied during this cruise; Kahe
Point Station (21o20.6'N, 158o16.4'W), and Station 3 (23o25'N, 158oW).
Continuous ADCP as well as thermosalinograph measurements were to be
made during the cruise. Other research objectives such as the
collection of water samples for ancillary investigations and
experiments were to be conducted as time permitted.
2. SCIENCE PERSONNEL
WOCE group:
Fernando Santiago-Mandujano Chief Scientist UH
Jefrey Snyder (Watch Leader) Electronics Technician UH
Molly Lucas Research Assistant UH
Craig Bishop Electronics Technician Seabird
Craig Nosse Research Associate UH
JGOFS group:
Luis Tupas Scientist (co-PI JGOFS) UH
Dale Hebel (Watch Leader) Scientist (co-PI JGOFS) UH
Don Wright Student UH
Lance Fujieki Computer Specialist UH
Terry Houlihan Research Associate UH
Daniel Sadler Graduate Student UH
Albert Colman Graduate Student UH
John Rooney Graduate Student UH - M. Landry
Ancillary projects
Mai Lopez Scientist SIO - M. Huntley
STAG
Will Hervig Technician UH-UMC
Pierluigi Pozzi Technician UH-UMC
3. GENERAL SUMMARY
All the primary JGOFS and WOCE objectives were accomplished despite the
fact that the ship had to return to Oahu in an emergency basis to seek
treatment for Terry Houlihan, who suffered a serious cut in his hand
during the first day of the cruise at the Station ALOHA. All cruise
activities were rescheduled to compensate for the 14 hours spent to
return to Oahu and back to the ALOHA station. Consequently the sediment
traps deployment time was reduced to 46 hours, and the visit to Station
3 was cancelled.
All samples for ancillary projects were taken. Weather conditions were
very favorable during the cruise. This allowed for a safe deployment
and recovery of the sediment traps, the deployment and recovery of the
primary production array and of the go-flo hydrocast, the completion of
the 36-hour CTD burst sampling including the deep cast; and the towing
of the optical plankton counter-CTD package in a zig-zag trajectory
within the ALOHA circle. The CTD in the OPC package did not transmit
data during this towing due to problems with the bulk connector. A
total of six (6) net tows were completed, although the flow-meter
malfunctioned during one of the night tows.
The ADCP was running without interruption throughout the cruise, but
the Ashtech GPS that provides its primary heading information stopped
working on the second day, and the problem went unnoticed for the rest
of the cruise. The thermosalinograph did not transmit data for about 20
hours early in the cruise. The sensor connectors got unplugged and the
problem was not detected until the second day of the cruise. Also, the
thermosalinograph apparently malfunctioned during the transect from
ALOHA to Snug harbor yielding very low salinities.
We arrived at Snug Harbor on May 24 at 0800 and immediately off-loaded
however the majority of the deck and lab equipment remained onboard for
the next cruise.
4. R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT
The R/V Moana Wave continues to maintain the excellent ship support for
our work. The officers and crew were most helpful and were very
flexible in receiving changes in our operational schedule. Technical
support during this cruise was good. STAG personnel were available at
any time to assist in our work.
5. DAILY REPORT OF ACTIVITIES (HST)
May 17, 1996; Loading Day
All equipment was loaded from Snug Harbor labs and UH. All electrical
connections for the CTD and OPC were made and tested. Niskin bottles
caps were assembled and checked. All instruments were installed,
secured and tested. No problems were encountered.
May 20, 1996.
All hands arrived on ship at 0800. Ship departed at 0930, delated 30
min due to ship traffic. Fire and emergency drills conducted by the
first mate at 1000. A short science personnel meeting followed in which
the schedule of activities was reviewed and safety measures were
stressed out. Thermosalinograph and ADCP working correctly. Prior to
the cruise, all the Niskin bottle lanyards were replaced, thus before
arriving to Kahe St. at 1120, the CTD was lowered to 20-m and all the
bottles were fired to check for any bottle leakages. At 1230, upon
arrival at Kahe St. a 750 m weight cast was conducted followed by a
1000 m CTD cast. Departed to ALOHA Station at 1400.
We arrived at ALOHA Station at about 2330. At 2345, while preparing to
deploy the sediment traps, Terry Houlihan suffered a cut in his hand
when trying to dispose the broken glass pieces of a Benthos floater
sphere overboard. The glass pieces were inside the floater's plastic
hard cover and a piece of glass fell on the upper part of Terry's right
hand, between the thumb and the wrist producing a deep cut 4 cm long.
Bleeding stopped shortly after applying pressure on the wound. He could
move his thumb but complained of numbness. The captain cleaned the
wound an applied butterfly bandages to close it. Since the wound
required further treatment, and since a helicopter evacuation would
probably not take place until daylight, we decided to stop all
operations and head back to Oahu to drop Terry off at a convenient
place for treatment. We arrived in front of Kaneohe bay at 0700
(5/21/96) and Terry was transported to the Heeia Kea small boat harbor
in the Zodiac boat. Stanley Winslow (Marine Center) was contacted by
cellular phone and made arrangements for pick up on land. Dave Karl
was also communicated of the situation by phone. After evacuation we
headed back to the ALOHA station to continue operations. An incident
report was completed by the Captain.
May 21, 1996.
A short science meeting was conducted at 1230, in which the captain
stressed out safety in view of Terry's accident. The meeting continued
with the review of the new cruise schedule. Lance Fujieki was
transferred to the night watch to compensate for Terry's absence. We
arrived at Station ALOHA at 1430.
Sediment trap deployment started immediately upon arrival at
station ALOHA and was completed at 1545. The 36-hour period of
CTD casts began at 1600. The schedule was rearranged to have the WOCE
deep cast at the end of the 36-hour period, right after the shallow
WOCE cast, and the visit to Station 3 was cancelled. Surface water was
pumped and filtered for phosphorus during casts 1 and 2 by A. Colman.
A plankton net tow was conducted at 2300. Three (3) 1000-m casts had
been conducted at station ALOHA by the end of the day. The
thermosalinograph sensors connector came dettached and did not transmit
data for about 20 hrs. The problem was detected and fixed at about
2200. Weather was favorable with 10 kt winds from the east, and 2-3 ft
waves.
May 22, 1996.
Operations at station ALOHA continued as planned. The Go-flo hydrocast
was deployed at 0200. The deepest bottle did not close. The primary
productivity array was deployed without difficulties at 0500 and
recovered at 1900. Two plankton net tows were conducted during the day
at 1100 and 1230 and one at night at 2300. By the end of the day there
were eight (8) CTD casts completed. The sediment traps positions were
not received by e-mail, thus a FAX was sent to Dave Karl requesting
them and he FAXed them to us. By 0900 the traps had drifted westward to
the edge of the circle. The weather continued being favorable, with
winds from the southeast at 12 kt, and 2-3 ft waves.
May 23, 1996.
The 36 hours period at station ALOHA ended with the shallow WOCE cast
at 0400 (cast 13), followed by the WOCE deep cast. The altimeter
worked correctly and the cast reached 5 m off the bottom. A plot of
the potential temperature near the bottom from this and the deep cast
from the previous cruise indicate that a cold event starts to develop.
Sediment trap ARGOS positions were received via e-mail and in a FAX
from D. Karl. At 1130 we began the transit to the location of the
traps, started the recovery at 1230 and ended at 1330. The recovery was
conducted without difficulties. The OPC/CTD package was deployed at
1415 and retrieved at 2130 after following a zig-zag trajectory within
the circle. The OPC worked correctly, but its CTD stopped transmitting
shortly after deployment due to a failure in the bulk connector
discovered after recovery. After retrieving the OPC we headed back to
Honolulu. The thermosalinograph apparently malfunctioned during the
transect to Honolulu. The salinities were below normal even after
increasing the flow through the plumbing to try to solve the problem.
One net tow was conducted at night at 0100, and another one during the
day at 1015. Surface water was pumped and filtered for phosphorus
during the deep cast by A. Colman. Winds were of about 10 kt from the
east, and 1-2 ft waves.
May 24, 1996.
Arrived at Snug Harbor at 0800. Proceeded with unloading however the
majority of the deck and lab equipment remained onboard for the next
cruise. Unloading completed at 1100.
ANCILLARY INVESTIGATIONS AND SPECIAL PROJECTS
M. Lopez Optical Plankton counter
J. Rooney Zooplankton dynamics
D. Sadler DIC sampling
A. Colman Phosphorus experiments
SAMPLES TAKEN FOR OTHER INVESTIGATORS
C. D. Keeling CO2 isotopes
P. Quay CO2 measurement
H. Thierstein Microscopy
| |