Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-70: Chief Scientist Report


Chief Scientist: L. TUPAS


Loading: March 22, 1996	
Departed: March 25, 1996 at 0830
Returned: March 29, 1996 at 0800
Vessel: R/V Moana Wave
Chief Scientist: Dr. Louie Tupas
Master: Captain Robert Hayes
Deck Operations: Mr. Luigi Pozzi
Electronics Technician: Mr. Steve Poulos


1.	SCIENCE PERSONNEL

	Dale Hebel - UH, JGOFS
	Luis Tupas - UH, JGOFS
	Lance Fujieki - UH, JGOFS
	Terrence Houlihan - UH, JGOFS
	Albert Colman - UH, JGOFS
	Jefrey Snyder - UH, WOCE
	Deborah Schulman - UH, WOCE
	Molly Lucas - UH, WOCE
	Fernando Santiago-Mandujano - UH, WOCE
	Dave Johnson - UH, WOCE
	Daniel Sadler - UH, Carbon Project
	John Rooney - UH, Zooplankton Project
	Mai Lopez - SIO, OPC/ADCP
	Tomoe Uehara - UH, Atmospheric Chemistry
	Lisa Campbell - UH, Picoplankton
	Dave Jones - CCharleston, Picoplankton


2.	GENERAL SUMMARY

All objectives of the JGOFS and WOCE programs were accomplished.  All
planned stations were occupied. All core samples were taken and the 36
hour CTD burst sampling period was not interrupted. All samples for
ancillary projects were taken. Floating sediment trap array,
upside-down sediment trap and primary production array deployed and
recovered succrsfully. No samples were lost during the in-situ
incubation. There were no major equipment failures. The optical
plankton counter was towed around Station ALOHA without any problem.


3.	R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT

The R/V Moana Wave continues to maintain the excellent ship support for
our work. The officers and crew were most helpful and accommodating.
They showed enthusiasm and concern for our work and were very flexible
in receiving changes in our operational schedule. Technical support
during this cruise was excellent. STAG personnel were available at any
time to assist in our work and made things much easier for us.


4.	DAILY REPORT OF ACTIVITIES

March 22, 1996; Loading Day

All equipment were moved from either SNUG Harbor labs or UH on this
day. All electrical and electronic connections were made for the CTD
and the OPC/CWS.  All lab equipment were stowed away and secured. All
instruments were tested and appeared functioning. No problems were
encountered.

March 25, 1996

All hands arrived on ship at 0800. Ship departed at 0830 to get ahead
of a Matson vessel arriving in the channel. Fire and emergency drills
conducted at 0930 followed by a safety briefing by the first mate and a
short science meeting. Arrived at Station Kahe at 1100. Conducted
weight cast and 1130 m CTD cast. All operations and sampling
accomplished by 1500. Started transit to Station ALOHA. Arrived at
Station ALOHA at 2230. Upside and floating sediment trap array
deployment procedures began at 0030, accomplished at 0130.

March 26, 1996

Sediment trap operations completed at 0030. Ship transited to center of
station and commenced WOCE deep cast at 0230. Delay was caused by the
sediemnt traps being in the center of the circle where we wanted to
conduct the CTD cast. Cast was completed at 0700. CTD burst sampling
commenced at 0900 to accomodate winch schedule. CTD casts maintained at
3 hour intervals. Noon zooplankton tow successful. One night tow was
accomplished. Passing showers encountered.

March 27, 1996

CTD casts continued at 3 hour intervals. Go-Flo cast conducted at 0230,
cast finished at 0315. Primary production array deployment commenced at
0530. CTD casts continued at 3 hour intervals. Zooplankton tows
conducted at noon. Retrieval of primary production array commenced at
18300. No samples were lost. CTD casts continued at 3 hour intervals.
One night tow was accomplished. Last 1000 meter cast conducted at 2100
fisnished at 2330.

March 28, 1996

Transit out of the circle to pump tanks, returned to the center at
0200. Shallow cast at 0300 followed by deep cast conducted at 0600,
completed at 1000. Proceeded to location of floating sediment trap
array.  Arrived at site and commenced recovery at 1130, accomplished at
1200.  Proceeded to site of upside-down sediment trap, commenced
recovery at 1330, accomplished at 1500. OPC deployed to conducted
transects through Station ALOHA and return leg to Honolulu. No probems
were encountered during the deployment. The pump system was turned on
and no interference with the CTD or OPC was found. The pump, however,
stopped operating about 5 minutes after pumping commenced. Attempts to
get water flowing through the pump system were unsuccessful.  OPC
retrieved at 2100 and proceed to Honolulu. The Continuous Water Sampler
Winch had adequate power to retreve the device while the ship moved at
2 knots. Examination of the submersible pump after retrieval showed
that the motor was not turning and oil was leaking out of the end.

March 29, 1996

Arrived at Snug Harbor at 0800. Proceeded with unloading however
the majority of the deck and lab equipment remains onboard for the next
cruise. Unloading completed at 1100. 


ANCILLARY INVESTIGATIONS

1. Zooplankton sampling - J. Rooney
2. DIC sampling - D. Sadler
3. Optical Plankton counts - M. Lopez
4. Phosphorus experiments -  A. Colman
5. Picoplankton studies - L. Campbell, D. Jones


SAMPLES TAKEN FOR OTHER INVESTIGATORS

1. DIC water samples for C.D. Keeling, SIO-UCSD
2. DIC water samples for P. Quay, UW
3. Microscopy samples for H. Thierstein, ETH-Zurich
4. Surface seawater for E. Laws, UH
5. Deep seawater for J. Gharib/J. Resing, UH
6. Surface and deep seawater for C. Measures, UH
7. Deep seawater for C. Stump, UW