Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-67: Chief Scientist Report


Chief Scientist: F. SANTIAGO-MANDUJANO


            HOT 67 Chief Scientist's Cruise Report
                       R/V Moana Wave
                     25-30 October 1995
                              
                              
Departed: October 25, 1995 at 0800 (HST)
Returned: October 30, 1995 at 0730
Vessel: R/V Moana Wave 
Operator: University of Hawaii 
Chief Scientist: Fernando Santiago-Mandujano 
Master: Captain John Stahl 
Deck Operations: Pierluigi Pozzi 
Electronics Technicians: Will Hervig, Sharon Stahl


1.      SCIENTIFIC OBJECTIVES

The primary objective of the cruise was to maintain the collection of
hydrographic and biogeochemical data at the Hawaii Ocean Time-series
(HOT) station. The HOT station, also known as Station ALOHA (A Long
Term Oligotrophic Habitat Assessment) is defined as a circle with a 6
nautical mile radius centered at 22o45'N, 158oW.  Free- drifting
sediment traps were planned for deployment for approximately 72 hours
from the site to measure sedimentation rates of particulate matter. CTD
casts at three hour intervals were planned to obtain temperature,
salinity, dissolved oxygen, flash fluorescence and beam attenuation
profiles. Water samples for analysis of dissolved nutrients, gases, and
biomass were to be collected with the CTD casts.  Another free-drifting
array to conduct a primary production experiment was planned for a 12
hour deployment. Three other stations were planned to be occupied
during this cruise; Kahe Point Station (21o20.6'N, 158o16.4'W), Kaena
Point Station (21o50.76'N, 158o21.84'W), and Station 3 (23o25'N,
158oW). Two bottom moored inverted echo sounders (IES) were planned to
be recovered at the Kaena and ALOHA Stations, and a third one to be
deployed at the ALOHA Station. A moored sediment trap was planned to be
recovered at the ALOHA station. Continuous ADCP measurements were to be
made during the cruise, as well as thermosalinograph measurements.
Other research objectives such as the collection of water samples for
ancillary investigations and experiments were to be conducted as time
permitted.


2.      SCIENCE PERSONNEL

  WOCE group:
     Fernando Santiago-Mandujano   	Chief Scientist		      UH
     Jefrey Snyder (Watch Leader)       Electronics Technician 	      UH
     Molly Lucas           		Research Assistant	      UH
     Mark Baird               	        Graduate Student       	      UH
     Craig Nosse               		Research Associate	      UH

  JGOFS group:
     Luis Tupas               		Scientist (co-PI JGOFS)	      UH
     Ursula Maagard           		Research Associate	      UH
     Lance Fujieki            		Computer Specialist	      UH
     Terry Houlihan (Watch Leader)      Research Associate	      UH
     Daniel Sadler            		Graduate Student       	      UH - T. Li
     Chris Carrillo	      		Graduate Student	      UH

  Ancillary projects
     Chuck Stump             		Scientist		      UW - S. Emerson
     Mike Mulroney	      		Technician		      URI - R. Watts
     Robert Miller            		Graduate Student	      UH - M. Landry
     Mai Lopez		      		Scientist		      SIO - M. Huntley

  STAG
     Sharon Stahl             		Technician		      UH-UMC
     Will Hervig             		Technician		      UH-UMC
     Pierluigi Pozzi         		Technician		      UH-UMC


3.      GENERAL SUMMARY

All the primary JGOFS and WOCE objectives were accomplished.  All
samples for ancillary projects were taken, and the ADCP and
thermosalinograph were running without interruption throughout the
cruise. Weather conditions were very favorable during the first three
and a half days, allowing for the safe recovery of the Kaena Station
IES, the deployment of the sediment trap array, the deployment and
recovery of the primary production array, the completion of the 36-hour
CTD burst sampling and two near-bottom CTD casts; and the recovery and
deployment of the Station ALOHA IESs. Six dark bottles were lost from
the primary production array. Chuck Stump attached his gas tension
device-Seacat package on the sediment trap line, at about 15 m. Mike
Mulroney suffered a minor accident after the IES deployment while
retrieving the transducer from the side of the ship. He was pulling the
cable a little fast, when the transducer came over the rail and onto
his head, producing a small cut on his forehead that was readily
treated on board.  He reported no complications and the injury was
healing by the end of the cruise. The Captain was notified and an
incident report was filled.

 With the weather deteriorating on the fourth day due to the appearance
of a front, the conditions became less favorable for the recovery of
the sediment trap array. The spar buoy broke in half during recovery
and the bottom half went into the water together with the lead weight.
The rest of the array was safely retrieved. The moored sediment trap
was successfully recovered on the fifth day. Station 3 was also
visited, and a near-bottom CTD cast was conducted. The optical plankton
counter-CTD fish was towed from the ALOHA to the Kahe Station without
any problem, although its CTD did not work correctly. The Station Kahe
was occupied near the end of the cruise, and a CTD cast was obtained.
The pylon failed to fire 8 of the 16 intended bottles during this cast.
We arrived at Snug Harbor on October 30 at 0730 and immediately
off-loaded.


4.      R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT

The R/V Moana Wave continues to maintain the excellent ship support for
our work. The officers and crew were most helpful and were very
flexible in receiving changes in our operational schedule.  Technical
support during this cruise was excellent. STAG personnel were available
at any time to assist in our work. The familiarity that the ship's and
STAG personnel have acquired with our regular cruise activities made
the work and interactions run in a smooth manner, which translated into
a very efficient working relationship.


5.      DAILY REPORT OF ACTIVITIES (HST)

October 20, 23 and 24, 1995; Loading Days

Part of the JGOFS and WOCE equipment was loaded and installed on
October 20 to be ready for the SOEST open house. Tours to the R/V Moana
Wave were given to the public on October 21 as part of the open house
activities, and some of the HOT equipment and procedures were being
shown to the people by JGOFS and WOCE personnel. The rest of the
equipment was loaded, installed, secured and tested on October 23 and
24.

October 25, 1995

All hands arrived on ship at 0730. Ship departed at 0800. Fire and
emergency drills conducted at 0845 followed by safety briefing by first
mate. A short science personnel meeting followed, in which the schedule
of activities was reviewed.  Steamed directly towards Kaena Station to
recover the IES. ADCP working correctly and set to bottom track mode in
shallow waters. Thermosalinograph set to record data throughout the
cruise. Favorable weather with 15 kt winds and calm seas 2-3 ft
height.  Arrived at Kaena Station at 1310. Jefrey and Mike started IES
recovery procedures and located the IES at 1400.  The IES was released,
came to the surface at 1515, and was located by its radio signal. At
1530 the IES was retrieved and brought in on board. All the system
seemed to be in good working conditions, including the strobe light.
Steamed towards Station ALOHA and arrived at 2200 when the sediment
trap deployment started.  Deployed the array including Chuck Stump's
Gas Tension Device-Seacat at 15 m. A one-bottle Go-flo cast was
obtained for Chuck. Operations finished at 2345.

October 26, 1995

Operations conducted under calm seas, 2-3 ft height. Winds were less
than 8 kt. A weight cast was done between 0000 and 0100, after which
the WOCE deep cast started at 0130. The cast reached up to 4807 dbar, 6
m off the bottom, and it ended at 0525. The 36-hour CTD burst period
started at 0700 and CTD casts continued at 3 hour intervals. Some
twists in the CTD wire developed, despite Jefrey's procedures of
re-balancing the Rosette. Three 30-min net tows were conducted at 1100,
1400 and 2300 hrs.

October 27, 1995

Very favorable weather, with winds between 2 and 5 kt and the sea
surface almost flat. The 36-hour CTD burst sampling continued and ended
at 2000.  The JGOFS Go-flo cast was obtained at 0300. The primary
production array was deployed at 0500 and retrieved at 1800. Six dark
bottles were lost from two levels, only the mesh containers were
recovered. After the 36-hour burst sampling, the ship went out of the
circle to pump tanks.  The ship returned to the center of the circle
and one more 1000-m CTD cast was obtained at 2300. Two net tows were
conducted at 1100 and 2230.  Mike and Jefrey spent most of the day
sorting out some problems with the configuration and electronics of the
IES to be deployed. There was a 15-min swim call from the Captain at
1430.

October 28, 1995

One net tow was conducted at 0100, and one deep CTD cast, 4 m off the
bottom was obtained from 0300 to 0620. The Station ALOHA IES's recovery
and deployment were completed without any problem, under relatively
calm weather conditions. The IES was detected at about 0700, released
at 0737, and left the bottom at 0801. The IES reached the surface at
0912 and was retrieved at 0930. The whole package seemed to be in good
working conditions. The other IES was deployed at 1000 and reached the
bottom at 1100. Deployment coordinates 22o45.006'N, 158o00.007'W. Mike
Mulroney had a minor accident after the deployment while retrieving the
transducer from the side of the ship at about 1120. He suffered a small
cut on his forehead which was readily treated. After the IES operations
were completed we headed south to recover the sediment trap array. The
array drifted south, to the edge of the circle. As the weather
deteriorated due to the appearance of a front, the conditions became
less favorable for the recovery of the array. A one-bottle Go-flo cast
was conducted prior to the recovery at about 1200. The recovery was
conducted under the rain, with waves reaching 10-12 ft height and winds
of about 10 kt. The spar buoy broke in half during retrieval. The buoy
was hanging from the crane, when a big wave moved the ship, smashing
the middle of the buoy against the edge of the ship breaking it in
half. The bottom part of the buoy was lost. The rest of the equipment
was retrieved safely. Recovery operations ended at 1400.  Since the
operations were completed 3 hours ahead of schedule, an additional
1000-m CTD cast was conducted at Station ALOHA to test the conductivity
sensors. Conductivity sensor #679 was replaced by #527 prior to the
cast which started at 1630 and ended at 1718, after which the ship
headed towards Station 3. The bucket thermometer used for
meteorological observations broke when the bucket hit the side of the
ship while measuring sea surface temperature. The broken thermometer
was stored in the lab freezer for its future disposal.
 
October 29, 1995

Arrived at Station 3 and a near-bottom cast was conducted from 0030 to
0420, after which the ship headed towards the place where the sediment
trap mooring was located. The moored sediment trap was recovered
without any problem, under mild weather conditions. We arrived at the
site at about 0900. The mooring was released at 0930, reaching the
surface at 1030. Retrieving operations started and the mooring was on
board at 1200. Operations were successfully completed by 1300. Deployed
the OPC-CTD fish at 1330 and started a zigzag trajectory within the
circle, after this, at about 1630 we headed towards Station Kahe towing
the fish at about 8 kt. The fish's CTD seemed not to be working
correctly.

October 30, 1995

Started CTD cast at Kahe Station at 0300. After firing 6 bottles the
pylon wouldn't respond to the firing command from the computer. Using
the manual switch we were able to give back the control to the computer
and were able to continue firing the bottles. Only 8 out of the
expected 16 bottles closed (bottles 1-6 and 11-12). After sampling we
headed towards Snug Harbor at about 0445. Sharon Stahl turned ADCP to
bottom track mode when in range. Arrived at Snug Harbor at 0730.
Commenced off loading, all equipment and personnel cleared from the
ship at 1200.


ANCILLARY INVESTIGATIONS AND SPECIAL PROJECTS

Mai Lopez		Optical Plankton counter
Robert Miller		Zooplankton dynamics
Chuck Stump		Oxygen/Argon/Helium measurements
			NO3 measurements (Gas Tension Device)
Mike Mulroney		Inverted Echo Sounder
Dan Sadler		DIC sampling


SAMPLES TAKEN FOR OTHER INVESTIGATORS

C. D. Keeling 		CO2 isotopes
P. Quay 		CO2 measurement
H. Thierstein 		Microscopy

------------------------------------------------------------------

Mike Mulroney's Incident Report
-------------------------------

Accident summary  pertaining to a small cut  on the left forehead of
Mike Mulroney on October 28 1995.

I was taking in the 8012 transducer from the stb. side at about 11:00
and coiling it into a container on the deck.  It was raining so I was
moving a little faster, my head was below the rail as I was pulling the
cable and coiling it into the box. I lost track of where the transducer
was and pulled it over the rail on to my head which put a small cut on
my forehead. I saw no stars or flashing lights  just a little blood.

Addendum. The Captain was notified about the incident and first-aid
procedures were administered. The cut was cleaned with soap and
hydrogen peroxide and it soon stopped bleeding. Only a small band-aid
was applied on the cut, which was healing by the end of the cruise
without apparent complications.

Fernando S-Mandujano.