Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-157: Chief Scientist Report


Chief Scientist: F. SANTIAGO-MANDUJANO


           HOT-157 Chief Scientist's Cruise Report
                        R/V Kilo Moana
                       March 18-22, 2004

Cruise ID: KM0408
Departed:  March 18, 2004 at 1000 (HST)
Returned:  March 22, 2004 at 0730
Vessel:  R/V Kilo Moana
Operator:  University of Hawaii
Master of the Vessel: Captain Grey Drewry
Chief Scientist: Fernando Santiago-Mandujano
STAG Electronics Technician: Steve Poulos
STAG Deck Operations: Dave Gravatt

1.  SCIENTIFIC OBJECTIVES

 The objective of this cruise was to maintain a collection of
hydrographic and biogeochemical data at the Hawaii Ocean Time-series
(HOT) stations. Two stations were to be occupied during the cruise,
in the following order:

1) Station 1, referred to as Station Kahe, is located at 21 20.6'N,
158 16.4'W and was to be occupied on March 18 for about 5 hours.

2) Station 2: ALOHA (A Long Term Oligotrophic Habitat Assessment) is 
defined as a circle with a 6 nautical mile radius centered at 22 45'N, 
158W. This is the main HOT Station and was to be occupied for 3 days 
from March 19 to March 21.

 Two CTD casts were to be conducted at Station 1. The first one to test
oxygen sensors by Sea-Bird Electronics Inc. personnel, the second to
collect continuous profiles of various physical and chemical
parameters. Water samples were to be collected at discrete depths for
biogeochemical measurements.

 Upon arrival at Station ALOHA, a net tow was to be conducted, followed
by the deployment of a free-drifting sediment trap array. After
deployment, a full-depth CTD cast was to be conducted, followed by CTD
casts at strict 3 hour intervals for at least 36 hours for continuous
and discrete data collection, followed by a full-depth CTD cast
conducted by Sea-Bird personnel to conduct oxygen sensor experiments.

 One free-drifting array was to be deployed for 12 hours for incubation
experiments on March 20.

 A plankton net was to be deployed near noon and midnight on March 19
and 20 at Station ALOHA.

 After CTD work at Station ALOHA was accomplished, the ship was to transit
to recover the floating sediment trap array. After recovering the
sediment traps, the ship was to return to Sta. ALOHA to continue light
cast operations, and to conduct another full-depth CTD cast by Sea-Bird
personnel.

 After finishing operations at station ALOHA, the ship was to transit
back to Snug Harbor.

 A Profiling Reflectance Radiometer (PRR) was to be deployed for
half-hour periods near noon time on March 18, 20 and 21.

 A package including a Wet Labs AC9, a Chelsea Fast Repetition Rate 
Fluorometer (FRRf), and a SeaBird Seacat was to be used to profile the upper
300 m at Sta. ALOHA for one-hour periods on March 20 and 21. 

 The following instruments were to collect data throughout the cruise: 
an ADCP, a thermosalinograph, a fluorometer, and two anemometers.


2.  	SCIENCE PERSONNEL

JGOFS group:
 Karin Björkman                  Research Specialist            UH
 Tara Clemente                   Research Associate             UH
 Allan Devol			 Scientist			UW
 Lance Fujieki                   Computer Specialist            UH
 Eric Grabowski                  Research Associate             UH
 Marcie Grabowski                Graduate Student               UH
 Tom Gregory (Watch Leader)      Research Associate             UH
 Michael Rappe			 Scientist			UH
 Cecelia Sheridan                Graduate Student               UH 
 Benjamin Van Mooy		 Post-Doc			WHOI
 Blake Watkins                   Marine Engineer                UH

PO group:
 Daniel Fitzgerald (Watch Leader) Research Associate            UH
 Bruce Howe			Scientist			UW
 Maya Iriondo                   Graduate Student                UH 
 Marissa Kinnear Daniels        Undergraduate Student           UH
 Roger Lukas			Scientist			UH
 Darius Miller			Engineer			Sea-Bird
 David Murphy			Engineer			Sea-Bird
 Xavier Murard			Research Associate		UH
 Fernando Santiago-Mandujano    Chief Scientist (Res. Assoc.)   UH
 Mark Valenciano                Electronics Technician          UH



3.  GENERAL SUMMARY

 
 Operations were conducted as planned the first three days of the cruise, 
with delays in CTD operations caused by the increasingly rough weather.
The CTD wire developed kinks during three casts and required retermination.
 The light casts planned for the last day of the cruise were cancelled 
because the ship had to return to Honolulu harbor to disembark one of the
cruise members (Tom Gregory) who had to attend a family emergency. The
two Sea-Bird casts planned for the last day were combined into one cast,
which was conducted SW of Honolulu.

 Twelve 1000-m CTD casts and one deep cast (~4740 m) were conducted at
Station ALOHA.  Two 1000-m CTD casts were conducted at station Kahe,
one of them was for Sea-Bird. One deep CTD cast was conducted by Sea-Bird
personnel SW of Honolulu.

 The array of floating sediment traps and the primary productivity
incubation array were deployed, and recovered without incidents despite
the rough weather. Both arrays drifted east.

 C. Sheridan completed successfully 6 plankton net tows. 

 The PRR and AC9/FRRf were deployed as planned, except during the last
day of the cruise. 
 
 The ADCP and thermosalinograph ran without interruption throughout the
cruise, as well as the fluorometer, and the ship's two anemometers.

 Winds were from the north at 15-20 kt early in the cruise, increasing
to more than 30 kt the last day, changing direction to NE.  The swell
at ALOHA was about 6-8 ft the second day of the cruise, increasing to
more than 15 ft the last day at ALOHA. Scattered showers were present
during the cruise.

 We arrived back at Snug Harbor on March 22 at 0730. Full off-load 
took place immediately.


4.  R/V KILO MOANA, OFFICERS AND CREW, TECHNICAL SUPPORT

 The R/V Kilo Moana continues to maintain good ship support for our
work. Despite the bad weather we were able to conduct the deployment
and recovery of drifting arrays, and the net towings without incidents.
The CTD operations were affected by the deteriorating weather, causing
noisy data due to the increasing ship's roll and pitch, kinks in the CTD 
wire that required retermination three times during the cruise, and damages 
to four of our Niskin bottles when the package hit the ship during one 
of the recoveries.

 The officers and crew were most helpful and accommodating.  They showed
enthusiasm and concern for our work and were very flexible in receiving
changes in our operational schedule.

 Technical support during this cruise was excellent. STAG personnel were
available at any time to assist in our work and made things much easier
for us.

5.  DAILY REPORT OF ACTIVITIES (HST)

March 17, 2004; Loading Day

 Equipment loaded on this day starting at 0900. CTD wire was re-terminated 
and CTD system tested.

March 18, 2004

 The ship departed from Snug harbor at 1000. Safety and science meetings
conducted at 1045. Safety issues were addressed by the captain, and the
cruise activities were briefly reviewed by the chief scientist. Fire and
abandon ship drills were conducted at 1630.

 Arrived to Kahe Station at 1230 and a weight cast (400 lb) to 1000 m
was conducted. This was followed by a PRR cast. 

 A 1000-m CTD cast was conducted by Sea-Bird personnel between 1400 and
1520, followed by our regular 1000-m CTD cast at 1550, after which the
ship headed towards Station ALOHA at 1715. 

 Winds were from NW at 15 kt. 

March 19, 2004

 Arrived at Station ALOHA at 0020, and proceeded to conduct a net tow,
followed by the sediment traps deployment. The deep CTD/PO cast started at
0220 and ended at 0600 without any problems. This cast was followed by
the  shallow CTD/PO cast at 0800, which marked the beginning of the 36-hr
CTD burst period. A total of six 1000-m CTD casts were conducted this
day.
 
 Cast 3 was delayed 30 min due to problems keeping the appropriate
tension in the CTD winch tension mechanism.  The section of wire that
could have been affected was inspected before the cast.

 The CTD hit the deck's rail during recovery of cast 6. The top caps of
four Niskin bottles were damaged. The Rosette frame and CTD were
inspected and no damage was detected.

 Two net tows were conducted between 1000 and 1400 on March 19. Three net
tows were conducted at night.

 Winds increased between 15 and 20 kt from N, NW. The northern swell also
increased to about 6-8 ft. Sporadic rain.
 
March 20, 2004

 Six 1000-m CTD casts were conducted during this day. Increasing winds
and swell affected CTD operations. Kinks in the CTD wire developed near
the package during casts 10, 12 and 13, and required cutting of the
affected portion of the wire and retermination.

 The morning AC-9/FRRf cast was delayed one hour to 0500 because the
ship had to go out of the circle to pump waste water tanks.  The
primary productivity array was deployed immediately after at 0615.
Consequently cast 9 had to be moved from 0500 to 0630.

 The PRR was deployed near noon, followed by the AC-9/FRRf profile.

 The primary production array was retrieved at 1950 under rough
conditions. The array drifted 14 km east of the center of ALOHA Sta.

 Due to a family emergency of one of the science members (Tom Gregory),
we decided to reduce the number of operations at ALOHA and take him
back to Honolulu.

 Cast 14 was cancelled, and the HPLC samples planned to be collected
during this cast were taken during cast 13.

 The sediment trap array was recovered at 2130 under rough weather, the
array drifted 32 km east from the center of ALOHA Sta.

 The light casts planned for the last day of the cruise were cancelled.

 Two net tows were conducted near noon and one at night.

 Winds increasing to 20-25 kt from N, NW, and large northern swell of more 
than 15 ft. Occasional rain.

March 21, 2004

 Arrived to Honolulu harbor at 0730 and disembarked T. Gregory using a
small boat.

 The ship headed SW to 20 43'N, 158 15.2'W to conduct a deep CTD cast by
Sea-Bird personnel. The cast started at 1220 and ended at 1700, after 
which the ship headed back to Honolulu.

 Winds were from NE at more than 30 kt.

March 22, 2004

 Arrived at Snug Harbor at 0730. Full off-load took place immediately.


Sub component programs:

Investigator:                   Project/Institution:
-----------------               --------------------
Bob Bidigare                    HPLC pigments/UH
Mike Landry			Zooplankton dynamics/UH
John Dore			CO2 dynamics/UH

Ancillary programs:

Investigator:                   Project/Institution:
-----------------               --------------------
Charles Keeling                 CO2 dynamics and intercalibration/SIO
Mark Abbott/Ricardo Letelier    Optical measurements/OSU
Paul Quay			DI13C and O isotopes/UW
Penny Chisholm			Prochlorococcus population dynamics/MIT

Ancillary research during this cruise
-------------------------------------
Investigator:                   Project/Institution:
-----------------               --------------------
David Murphy/Darius Miller	Oxygen sensors pressure-temperature
				response/Sea-Bird Electronics Inc.

Allan Devol/Benjamin Van Mooy	Phosphate uptake by marine microorganisms/
				UW,WHOI

Michael Rappe			Marine bacterioplankton community structure/UH