Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-144: Chief Scientist Report


Chief Scientist: D. SADLER


CRUISE ID:  KOK0301
Departed:  January 15, 2003 at 0903 (HST)
Returned:  January 19 at 0735 (HST)
Vessel:  R/V Ka'imikai-o-Kanaloa
Operator:  University of Hawaii
Master of the Vessel: Captain Ross Barnes
Chief Scientist: Dan Sadler
STAG Electronics Technician: Steve Poulos
STAG Deck Operations: Dave Gravatt


1.  SCIENTIFIC OBJECTIVES

The objective of this cruise was to continue building a collection of
hydrographic and biogeochemical data at the Hawaii Ocean
Time-series (HOT) stations.  Three stations were to be occupied during
the cruise, in the following order:

1) Station 1, referred to as Station Kahe, is located at 21° 20.6' N,
158° 16.4' W and was to be occupied on January 15 for about 3 hours.

2) Station 2: ALOHA (A Long Term Oligotrophic Habitat Assessment) is
defined as a circle with a 6 nautical mile radius centered at 22° 45'N,
158° W.  This is the main HOT station and was to be occupied for 3 days
from January 16 though January 18.

3) Station 6: Located off Kahe Point at 21° 50.8' N, 158° 21.8' W.
Station 6 was planned to be occupied on January 18 for about 3 hours.

A single CTD cast was to be conducted at Station 1 to collect
continuous profiles of various physical and chemical parameters.  Water
samples were to be collected at discrete depths for biogeochemical
measurements.

Upon arrival at Station ALOHA, a floating sediment trap array was to be
deployed.  A full-depth CTD cast was to be conducted followed by CTD
casts at 3-hour intervals for 36 hours of continuous and discrete data
collection.  Plankton net tows were to be conducted near noon and
midnight on January 16 and 17.  A floating primary production
experiment was to be deployed and recovered on January 17. Following
recovery of the sediment traps on January 18, the ship was scheduled to
return to Station ALOHA for trace metal and optical casts.  Once work
was completed at Station ALOHA, the ship was to transit to Station 8
for a single 1000 m CTD cast then to Station 6 for a single 2500 m
cast. The ship was scheduled to return to SNUG Harbor at 0800 on
January 19 and unload.  The following instruments were to collect data
throughout the cruise: a shipboard ADCP, a thermosalinograph, a
fluorometer and an anemometer.



2.  	SCIENCE PERSONNEL

PO Group:
 Daniel Fitzgerald			Research Associate	UH
 Fernando Santiago-Mandujano 		Research Associate	UH
	(Watch Leader)
 Shimi Rii				Research Associate	UH
 Mark Valenciano			Electronics Technician	UH
 
JGOFS Group:
 Thomas Gregory				Research Associate	UH
 Anne Gasc				Research Associate	UH 
 Lance Fujieki				Computer Specialist	UH
 Tara Clemente	(Watch Leader)		Research Associate	UH
 Daniel Sadler (Chief Scientist)	Research Associate	UH
 Karin Björkman				Scientist		UH
 Cecelia Sheridan			Graduate Student	UH
 Randy Naish				Volunteer		HI

STAG Group:
 Dave Gravatt				
 Steve Poulos


3.  GENERAL SUMMARY

All operations at all stations were conducted as planned with the two
exceptions noted below. Twelve 1000 m and two 4800 m CTD casts were
obtained at Station ALOHA. A single 1000 m casts was obtained at
Station Kahe.  A 2500 m CTD cast was completed at Kaena Point.  Also,
three PRR/TSRB cast were performed at Station ALOHA.  Due to strong
winds and high seas, the sediment trap deployment was cancelled.  A
slow transit also caused cancellation of an open 1000 m CTD cast.

C. Sheridan successfully completed six plankton net tows.

Strong winds and high seas made for a slow transit to Station ALOHA.
Once on station, the R/V KOK provided a stable platform for science.
Credit for the successful cruise was due in large to the experience and
professional seamanship exhibited by the officers and crew o the R/V
KOK.

The ADCP ran without interruption throughout the cruise, as well as the
fluorometer, thermosalinograph and the ship's anemometer.

All ancillary work was completed.

We arrived back at Snug Harbor on January 19 at 0800.  A complete
off-load took place immediately.



4.  R/V KA'IMIKAI-O-KANALOA, OFFICERS AND CREW, TECHNICAL SUPPORT

The R/V Ka'imikai-o-Kanaloa and her crew delivered excellent ship
support for our work. Despite the rough conditions, the officers and
crew were most helpful and accommodating and are to be commended for
maintaining high standards. They showed enthusiasm and concern for our
work and were very flexible in receiving changes in our operational
schedule.

Technical support during this cruise was excellent. STAG personnel were
available at any time to assist in our work and made things much easier
for us.



5.  DAILY REPORT OF ACTIVITIES (HST)

January 14, 2003; Loading Day

Equipment loaded on this day.  The CTD cable was re-terminated,
followed by a test of the CTD system.


January 15, 2003

The ship departed from Snug harbor at 0900.  Fire and abandon ship
drills were conducted followed by a science meeting to review the
objectives and schedule for the cruise. We arrived at Station Kahe at
1252 and immediately deployed the PRR and TSRB.  A weight cast (400 lb)
to 1000 m preceded a 1000 m CTD cast. The ship departed Station Kahe at
1710 and proceeded to Station ALOHA.


January 16, 2003

We arrived at Station ALOHA at 0500.  Because of the rough conditions,
sediment trap deployment was postponed until daybreak and we proceeded
with the deep CTD cast to 4800 m.  A net tow was conducted at 0956.
The 36 hour burst CTD sampling began at 0819 and continued throughout
the day. Five 1000 m casts were completed.  Additional net tows were
completed at 1335, 1358 and 2225.  At daybreak, it was determined that
deployment of the sediment trap array was possible but a successful
recovery was questionable.  Since the weather was forcast to be rough
at the end of the cruise, we decided to cancel the sediment trap
deloyment.


January 17, 2003

Seven 1000 m CTD casts were completed.  The primary production array
was deployed at 0621 and recovered at 1739.  Net tows were completed at
0107, 0301 and 1045.  The PRR/TSRB optical packages were deployed at
noon.  An AC-9/FRRf casts was conducted at 1303.  At 1300, the CTD
cable was reterminated due to a kink on the cable near the CTD, caused
by excessive ship's motion.

January 18, 2003

A 4500 m deep CTD cast was completed at 0222.  At 1017 the Automated
Trace Metal (ATE) sampler was deployed.  The PRR/TSRB optical packages
were deployed at 1105 followed by an AC-9/FRRf casts at 1142 and 1254.
The ship departed Station ALOHA at 1405 and transited to Station 6.  We
arrived at Station 6 at 1925 and conducted a 2500 m CTD cast at 1939.
We departed Station 6 at 2136 proceeded to Honolulu Harbor.


January 19, 2003

We arrived at Snug Harbor at 0800.  A full offload took place upon
arrival.




WEATHER:

Below is the cruise bridge log description for HOT 144.  Wind and sea
directions are in degrees, wind speed in knots, seas in Beaufort scale,
swells in feet, barometer in inches Hg, temp in F (dry bulb), clouds in
tenths.

Date		 Wind	     Sea       Swell	   Barometer	Temp   Clouds

Wed. 15 January  300, 25-40  300, 6-7  270, 10-15  29.80-29.86  70-77  3-10 
Thu. 16 January  320, 8-30   320, 3-7  315, 13-15  29.87-29.95  62-76  2-7
Fri. 17 January  220, 14-28  220, 3-5  310, 8-12   29.76-29.88  67-74  1-9
Sat. 18 January  230, 12-26  235, 4-6  310, 8-10   29.77-29.86  72-74  2-9
Sun. 19 January  330, 11     330, 3    320, 3	   29.87        72     10



Sub component programs:

Investigator:                   Project:
-----------------               ----------
Bob Bidigare			HPLC pigments/UH
Mike Landry			zooplankton dynamics/UH
John Dore			CO2 dynamics/UH


Ancillary programs:

Investigator:                   Project:
-----------------               ----------
Charles Keeling			CO2 dynamics and intercalibration/SIO
Paul Quay			DI13C and O isotopes/UW
Mark Abbott/Ricardo Letelier	Optical measurements/OSU
Sally Chisholm			Prochlorococcus population dynamics/MIT