HOT-131: Chief Scientist ReportChief Scientist: K BJÖRKMAN
Departed: October 21, 2001 at 0900 (HST)
Returned: October 26, 2001 at 0730
Vessel: R/V Ka'imikai-o-Kanaloa
Operator: University of Hawaii
Master of the Vessel: Captain Ross Barnes
Chief Scientist: Karin Björkman
STAG Electronics Technician: Steve Tottori
STAG Deck Operations: Dave Gravatt
1. SCIENTIFIC OBJECTIVES
The objective of this cruise was to continue building a collection of
hydrographic and biogeochemical data at the Hawaii Ocean Time-series
(HOT) stations. Four stations were to be occupied during the cruise, in
the following order:
1) Station 1, referred to as Station Kahe, is located at 21o 20.6'N, 158o
16.4'W and was to be occupied on October 21 for about 3 hours.
2) Station 2: ALOHA (A Long Term Oligotrophic Habitat Assessment) is
defined as a circle with a 6 nautical mile radius centered at 22o
45'N, 158oW. This is the main HOT station and was to be occupied for 4
days from October 22 to October 25.
3) Station 8, referred to as HALE-ALOHA is the location of the deep
ocean mooring (20o 20'N, 158o 10.6'W). It was to be occupied on October
25 for about 2 hours.
4) Station 6, referred to as Station Kaena, is located off Kaena Point
at 21o 50.8'N, 158o 21.8'W was to be occupied on 25 October for about 4
hours.
A single CTD cast was to be conducted at Station 1 to collect
continuous profiles of various physical and chemical parameters. Water
samples were to be collected at discrete depths for biogeochemical
measurements. PRR and TSRB measurements were also to be made.
Upon arrival at Station ALOHA, net tows were to be conducted followed
by the deployment of a free-drifting sediment trap array. After
deployment, a full-depth CTD cast was to be conducted, followed by CTD
casts at strict 3 hour intervals for at least 36 hours for continuous
and discrete data collection followed by another full-depth CTD cast.
Two other free-drifting arrays were to be deployed on October 23: an
oxygen balance experiment for 24 hours and a primary production
experiment for 12 hours. Upon retrieval of the oxygen array a fourth
free-floating array was to be deployed on October 24 for an additional
24 hours (B. Popp alkenone experiment). After the deployment of the
alkenone array the ship was to transit to recover the sediment trap
array after which the ship should return to Sta ALOHA for additional
sampling. Plankton net tows were to be conducted near noon and
midnight, with additional surface tows in conjunction to these tows, on
October 22 and 23 at Station ALOHA. In situ pumping was to be conducted
in the afternoon for a period of 1.5 hours on October 22, 23 and 24.
After the last in situ on pumping on October 24 two additional CTD
casts were to be conducted, the second one to be a full-depth cast. PRR
and TSRB deployments and recoveries were to be done around noon October
22 and 23.
After work at Station ALOHA was accomplished, and the alkenone array
recovered at dawn on October 25, the ship was to transit to Station 8,
to conduct one 1000-m CTD cast, after which the ship was to transit to
station 6.
A near-bottom CTD cast (~2500 m) was to be conducted at Station 6
including salinity samples for calibration, after which the ship was
to transit back to Snug Harbor.
The following instruments were to collect data throughout the cruise: a
shipboard ADCP, a thermosalinograph and fluorometer, and an
anemometer.
2. SCIENCE PERSONNEL
WOCE group:
Noel Larson Research Associate UH
Jeremiah Johnson (Watch Leader) Research Associate UH
Mark Valenciano Electronics Technician UH
Fernando Santiago-Mandujano Research Associate UH
(Watch Leader)
Martin Orlando Volunteer (WOCE) UH
JGOFS group:
Karin Björkman (Chief Scientist) Research Specialist UH
Anne Gasc Research Associate UH
Lance Fujieki Computer Specialist UH
Paul Morris Technician UH
Tom Gregory Research Associate UH
Ancillary projects:
Brian Popp Scientist UH
Bryan Deschene Graduate student UH
Donielle Chittenden Undergraduate student UH
Cecelia Sheridan Graduate Student UH
Colleen Allen Research Associate UH
3. GENERAL SUMMARY
Operations were conducted as planned without any serious interruptions.
Fourteen 1000-m CTD casts, two deep cast and two 200-m casts were
obtained at Station ALOHA. One 1000-m CTD cast was obtained at Station
Kahe and one 1000-m CTD cast at Station HALE-ALOHA. One near-bottom
cast (~2500-m) and one 1000-m cast were obtained at Station Kaena.
The array of floating sediment traps, the oxygen array, the primary
productivity array and the alkenone array were all deployed and
recovered without major incidents. All of the arrays drifted
southwest ward. The sediment traps drifted about 9 nmi SW from the
center of the circle.
C. Allen and C. Sheridan, successfully completed 9 plankton net tows,
plus an additional 2 surface tows.
The dual in situ pumps were successfully deployed as planned.
PRR and TSRB measurements were successful on all deployments.
The ADCP ran without interruption throughout the cruise, as well as
the fluorometer, thermosalinograph and the ship's anemometer.
We arrived back at Snug Harbor on October 26 at about 0730. A full
off-load took place immediately.
4. R/V KA'IMIKAI-O-KANALOA, OFFICERS AND CREW, TECHNICAL SUPPORT
The R/V Ka'imikai-o-Kanaloa and her crew continue to deliver excellent
ship support for our work. The officers and crew were most helpful and
accommodating. They showed enthusiasm and concern for our work and
were very flexible in receiving changes in our operational schedule.
Technical support during this cruise was excellent. STAG personnel
were available at any time to assist in our work and made things much
easier for us.
5. DAILY REPORT OF ACTIVITIES (HST)
October 20, 2001; Loading Day
Equipment loaded on this day. Tested CTD system.
October 21, 2001
The ship departed from Snug harbor at 0900 on schedule. Fire and
abandon ship drills were conducted at 0930, followed by a short science
meeting during which the cruise schedule was reviewed, and safety
issues were discussed.
We arrived at Kahe station at 1200 and a weight cast (400 lb) to 1000 m
was conducted. The PRR and TSRB were deployed at 1240 and both worked
without problems. The CTD cast was commenced at 1330 and ended at
1425. Some bottles were leaking on retrieval. The Seapoint fluorometer
(SN 2383) was used and appears to be very sensitive relative to the
Seatech fluorometer used previously. After station 1 had been sampled
we commenced our transit to Sta ALOHA. Due to high seas our speed was
reduced to 7-8 knots.
October 22, 2001
We arrived at station ALOHA at 0145. Due to the late arrival the
scheduled net tows were cancelled and we instead proceeded to deploy of
the sediment traps. The traps were released at 0255 and the first deep
WOCE cast started at 0310. At 0800 the 36-hr CTD cast period started. A
total of six 1000-m CTD casts were conducted this day. The Seapoint
fluorometer failed on the upcast of s2c3 and was exchanged for the
Seatech instrument was mounted for cast s2c4 and appeared to be working
satisfactory. The exact problem with the Seapoint fluorometer was not
diagnosed at this time. Continued to have problems with leaking
bottles, sometimes to the point where sampling was compromised.
Net tows were conducted prior to, and after noon as well as at night.
There appeared to be a lot of material in the nets (Trichodesmium sp
among others).
PRR and TSRB cast went as scheduled without problems.
The in situ pumps were deployed at 1500 and recovered at 1655.
October 23, 2001
Seven 1000-m and one 200-m CTD casts were conducted during this day.
The 36-hour burst-sampling period ended with cast 14. Bottles
continued to leak. The top o-ring and cap replaced on one bottle.
The oxygen array was deployed at 0330, an hour earlier than originally
scheduled, without problems.
The primary productivity array was deployed at 0630 and was recovered
at 1800. One set of net tows was conducted in the day and one at
night. The 1300 tows were cancelled.
PRR and TSRB cast went as scheduled without problems.
The in situ pumps were deployed at 1500 and recovered 1630.
October 24, 2001
A second shallow cast (200m) was conducted at 0100 for the B. Popp
experiment.
The alkenone array was deployed at 0400. The oxygen array was recovered
at 0615. The sediment trap array was recovered at 0900. The array
drifted about 9 nm southwest from Station ALOHA.
The in situ pumps were deployed at 1500 and recovered at 1730.
One CTD cast to 1000 m (#17) was conducted followed by the second WOCE
deep cast at 2000 hours. The Seatech fluorometer was exchanged for the
Seapoint (SN 2384) at s2c17 for additional calibrations of this
instrument. The SeaPoint was then used throughout the rest of the
cruise and worked satisfactory.
There was a small flooding of the wet lab around 1400 due to an engine
room valve accidentally being shut. Clean water entered the wet lab
through the floor drain. The problem was rectified immediately after
discovery and the water spill cleaned up.
October 25,
The alkenone array was recovered at dawn without problems after which
we steamed to sta 8.
A 1000-m CTD cast was conducted at HALE-ALOHA (sta 8) at 1100.
Station Kaena was occupied from 1700 to 2100 for two CTD casts. The
second Seapoint instrument (SN 2383) was tested on both casts and
again failed as earlier in the cruise. This instrument will be sent
back to the manufacturer for inspection. The last cast was to test the
bottle failure rate when the o-rings had been greased with silicon
relative to untreated o-rings, since leaking bottles had been a
persisting problem during the cruise. The procedure reduced the number
of leaking bottles. Mark Valenciano is working on a solution that will
not compromise the water samples. The bottles and o-rings will be
cleaned from silicon before HOT 132.
There were complaints about the noise level apparently generated by the
compressor of the air conditioning unit in the Rock lab. The chief
engineer was notified and will try to rectify the problem until HOT
132. However, time constrains between cruises may not allow for these
repairs by then.
October 26,
Arrived at Snug Harbor at 0730 and a full off-load was done.
6. WEATHER
Below is the cruise bridge log description for HOT 131. Wind and sea
directions are in degrees, wind speed in knots, seas in Beaufort,
swells in feet, barometer in inches Hg, temp in Deg. F (dry bulb),
clouds in tenths.
Date Wind Sea Swell Barometer Temp Clouds
Sun 21, Oct. 070, 15-22 070, 3-4 065-100, 6-8 29.93-30.00 76-86 2-4
Mon 22, Oct. 065-080, 15-20 065-080, 3-4 030-080, 4-8 29.94-30.02 74-81 2-5 (showers)
Tue 23, Oct. 015-090, 9-15 015-090, 2-3 020-070, 3-5 29.88-29.96 75-81 3-7
Wed 24, Oct. 120-140, 4-10 120-171, 1-2 040-060, 4-5 29.86-29.95 75-84 1-7
Thu 25, Oct. 090-140, 8-14 090-140, 2-3 030-080, 3-4 29.91-30.01 77-81 6-10
Sub component programs:
Investigator: Project:
----------------- ----------
Bob Bidigare HPLC pigments/UH
Mike Landry zooplankton dynamics/UH
John Dore CO2 dynamics/UH
Ancillary programs:
Investigator: Project:
----------------- ----------
Charles Keeling CO2 dynamics and intercalibration/SIO
Paul Quay DI13C and O isotopes/UW
Steve Emerson O2, N2, Ar, Ne dynamics/UW
Mark Abbott/Ricardo Letelier optical measurements/OSU
Claudia Benitez-Nelson P isotopes, thorium/UH
Peter J. LeB. Williams oxygen balance/U Wales Bangor, UK
Others:
Investigator: Project:
----------------- ----------
Dale Hebel EOC production /UH
Karin Björkman phosphorus cycling/UH
John Dore N2 fixation, PIC, P15N/UH