Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa


HOT-107: Chief Scientist Report


Chief Scientist: L. TUPAS


Vessel: R/V KaImikai O Kanaloa
Loading: August 10, 1999			
Departed: August 11, 1999 at 0900	
Returned: August 16, 1999 at 0800	

Chief Scientist: Dr. Louie Tupas	
Master: Captain Robert Hayes
Deck Operations: Mr. Dave Gravatt	
Electronics Technician: Mr. Will Hervig

1.	SCIENCE PERSONNEL HOT-106

	Luis Tupas - UH, scientist
	Dale Hebel  UH, scientist
	Lance Fujieki - UH, computer specialist
	Terry Houlihan  UH, research associate
	Karin Bjorkman  UH, research associate
	Dan Sadler - UH, research associate
	Ursula Magaard- UH, research associate
	Craig Nosse - UH, research associate
	Don Wright - UH, research associate
	Fernando Santiago-Mandujano - UH, research associate
	Mark Valenciano  UH, marine technician
	Stephanie Christensen  UH research associate
	Jessica Walter - UH, REU student
	Daniel Warren  UH, REU student
	Claudia Benitez-Nelson  UH, scientist 
	Steve Johnson  UH Undergraduate student
	Charles Stump  UW Research Associate
	Roberta Hamme  UW Graduate student



2.	GENERAL SUMMARY

All objectives of the JGOFS and WOCE programs were accomplished with
the exception of the inverted echo sounder which failed to release from
its anchor.  All planned stations were occupied. Weather and sea
conditions were moderate to rough but within limits of safety for deck
operations. All core samples were taken and the 36 hour CTD burst
sampling period was not interrupted. All samples for ancillary projects
were taken. Floating sediment trap array and primary production array
deployed and recovered successfully. No samples were lost during the
in-situ incubations. ADCP measurements were made throughout the
cruise.



3.      R/V Ka Imikai O Kanaloa, OFFICERS AND CREW, TECHNICAL SUPPORT

This was the second HOT core cruise on the R/V K-O-K. Most of the
problems encountered on the previous HOT cruised were properly
addressed.  Ships crew gave excellent support and showed enthusiasm and
concern for our work and were very flexible in receiving changes in our
operational schedule and logistical support.  Technical support during
this cruise was excellent. STAG personnel were available at any time to
assist in our work and made things much easier for us.



4.	DAILY REPORT OF ACTIVITIES

August 10, 1999; Loading Day
 
We did a full on-load for this cruise. The ships main deck was
configured for HOT equipment. The main lab van and the rope winch were
secured inside the submarine hangar. The equipment van and second
radiation van were secured on the O-2 deck.  All deck and lab equipment
were loaded and secured within the ships labs. All electrical and
electronic connections were made for the CTD. All other equipment and
containers were stowed away and secured. All laboratory instruments
were tested and appeared functioning. No problems were encountered.

August 11, 1999

We departed Snug Harbor at 0800. Fire and abandon ship drills were held
at around 0930. We arrived at Station Kahe at 1130. Upon arrival the
PRR and TSRB were deployed and retrieved. CTD cast started at 1300.
Work at Station Kahe was accomplished by 1600 and the ship proceeded to
Station ALOHA.

August 12, 1999

Ship arrived at Station ALOHA at 0100. The IES was located and
communications were established. The release command was given but the
IES remained at the bottom. We monitored the IES and made positions
determinations as the ship moved towards and away the IES location.
Unfortunately the IES remained in its original position despite the
release mechanisms appearing to have functioned.  We stated to monitor
the IES for the rest of the day. A CTD cast was made  at around 0700
and a series of instrument test casts were made afterwards. An in-situ
pump was deployed for several hours in the afternoon. The floating
sediment traps were deployed at 1600.

August 13, 1999

The first deep cast was made at 0300. The 36-hour burst sampling
started at 0900.  Work continues according to schedule without any
problems. PRR and TSRB casts conducetd at noon. Net tows conducted at
noon and midnight.

August 14, 1999

Work continues as scheduled. Go-Flo cast at 0200 with some difficulty.
Primary production experiment made from Go-Flo cast water. Primary
production experiment was deployed without incident at 0500. At noon we
did optical and atmospheric measurements as scheduled at Station ALOHA.
Net tows successful. Primary  production experiment retrieved at 1900
and all samples processed shortly after. CTD casts continue at 3 hour
intervals. Last cast started at midnight.

August 15, 1999 

Work has been proceeding as scheduled without any problems. Second WOCE
deep cast started at 0400 and completed at 0800. We received a telex
message from UH about the ARGOS positions. Ship made a final set of
positioning runs over the IES location. The IES had not moved since we
signaled the release code. Ship proceeded to the trap location and
traps retrieved at 1200. Ship then proceeded to HALE ALOHA. Arrived at
HALE ALOHA at 1400. Boat operations were cancelled because the small
boat engine was not functioning. CTD cast started at 1700 together with
trace metal sampling. Departed HALE ALOHA at 2000.

August 16, 1999

We arrived at Snug Harbor at 0800.  Unloading commenced immediately and 
completed at 1200. 

SAMPLES TAKEN FOR OTHER INVESTIGATORS

1. DIC water samples for Charles Keeling, SIO-UCSD
2. DIC water samples for Paul Quay, UW
3. Seawater for Ed Laws, UH
4. Phosphorus experiments by Karin Bjorkman, UH
5. Aerosol and ozone measurements for J. Porter, UH
6. Seawater for Ted Walsh, UH
7. N2O samples for Brian Popp, UH