Chief Scientist: L. TUPAS


Loading: March 12, 1999  Chief Scientist: Dr. Louie Tupas
Departed: March 15, 1999 at 0900 Master: Captain Robert Hayes
Returned: March 19, 1999 at 0830 Deck Operations: Mr. Dave Gravatt
Vessel: R/V Moana Wave  Electronics Technician: Mr. Will Hervig

1. SCIENCE PERSONNEL

 Luis Tupas - UH, JGOFS
 Dale Hebel  UH JGOFS
 Karin Bjorkman - UH, JGOFS
 Lance Fujieki - UH, JGOFS
 Terry Houlihan  UH JGOFS
 Scott Nunnery - UH, JGOFS
 Dan Sadler - UH, JGOFS
 Craig Nosse - UH, WOCE
 Don Wright - UH, WOCE
 Fernando Santiago Mandujano - UH, WOCE
 Mark Valenciano  UH, WOCE
 Albert Calbet - UH, Post-doc
 John DeVilbiss  HPU undergraduate
 Kamea Hadar  high school volunteer
 Angela Adams  UH Graduate Student

2. GENERAL SUMMARY

 All objectives of the JGOFS and WOCE programs were accomplished. All
planned stations were occupied. Weather and sea conditions were moderate
to rough but within limits of safety for deck operations. All core
samples were taken and the 36 hour CTD burst sampling period was not
interrupted. All samples for ancillary projects were taken. Floating
sediment trap array and primary production array deployed and recovered
successfully. No samples were lost during the in-situ incubations. ADCP
measurements were made throughout the cruise.

3. R/V MOANA WAVE, OFFICERS AND CREW, TECHNICAL SUPPORT

 The R/V Moana Wave continues to provide excellent ship support for our
work. The officers and crew were most helpful and accommodating. They
showed enthusiasm and concern for our work and were very flexible in
receiving changes in our operational schedule. Technical support during
this cruise was excellent. STAG personnel were available at any time to
assist in our work and made things much easier for us.

4. DAILY REPORT OF ACTIVITIES

March 12, 1999; Loading Day

 The ship was used for HOT-102 the prior month and there were no other
users afterwards. The ships main deck was already reconfigured for HOT
equipment. All deck and lab equipment were still in place from the
previous cruise. All electrical and electronic connections were made for
the CTD. All lab equipment were stowed away and secured. All laboratory
instruments were tested and appeared functioning. No problems were
encountered.

March 15, 1999

We departed from Snug Harbor at 0900 as scheduled without any problems.
Fire and emergency drills conducted at 0930 followed by a safety
briefing by the first mate and a short science meeting. Arrived at
Station Kahe at 1200 and conducted the weight cast to 1000 m and the
PRR/TSRB casts. A CTD cast to1000 meters was made. Aerosol and ozone
measurements were made. All samples were taken and we departed for
Station ALOHA at 1530. Seas and weather rough.

March 16, 1999

After a really rough transit we arrived at Station ALOHA circle shortly
after 0000 and commenced work with a net tow and then deployed the
floating sediment traps. The deep cast started at 0300. The 3-hour burst
sampling started at 0900. CTD casts at 3-hour intervals were conducted
without interruption. Seas still rough. Conducted optical casts and
atmospheric measurements near during SeaWIFs overpass.

March 17, 1999

Work continues according to schedule without any problems. Go-Flo cast
at 0300. Primary production experiment made from CTD and Go-Flo cast
water. Primary production experiment was deployed without incident. EOC
spikes were performed. At noon we did optical and atmospheric
measurements as scheduled at Station ALOHA. Net tows so far successful
and grazing experiments are underway. Primary  production experiment
retrieved at 1900 and all samples processed shortly after. The primary
production spar buoy broke in half but we were able to retrieve both the
upper half with the VHF transmitter. It was also difficult retrieving
the lower half and the samples but we were able to do it. CTD casts
continue at 3 hour intervals. Last cast ended at midnight.

March 18, 1999

We have been receiving ARGOS positions for the sediment trap array. They
have almost 30 miles. Work has been proceeding as scheduled without any
problems. Second WOCE deep cast completed at 0700. After last cast, ship
proceeded sediment traps. Traps retrieved at 1000 and ship proceeded to
HALE ALOHA. Arrived at HALE ALOHA at 1500. Conducted CTD cast, optical
cast and trace metal sampling. We remained at station for the WOCE test
of the new CTD hardware and software. We departed HALE ALOHA at 1900.

March 19, 1999

We arrived at Snug Harbor at 0830.  Unloading commenced immediately and
completed at 1200.

SAMPLES TAKEN FOR OTHER INVESTIGATORS

1. DIC water samples for C.D. Keeling, SIO-UCSD
2. DIC water samples for P. Quay, UW
3. Seawater for E. Laws, UH
4. Phosphorus experiments by Karin Bjorkman, UH
5. Aerosol and ozone measurements for J. Porter, UH
6. Calcite measurement by Angela Adams
7. N2O samples for B. Popp, UH