|
Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa |
| » Home » Cruise Schedules, Reports & Cast Sheets » HALE-ALOHA 7B CS Report | |
HALE-ALOHA 7B: Chief Scientist ReportChief Scientist: T. HOULIHANHALE ALOHA recovery cruise R/V Thomas Thompson 26-27 January 2000 Personnel List WOCE group: Mark Valenciano Electronic Technician UH Don Wright Research Associate UH JGOFS group: Dale Hebel Chief Scientist UH Terrence Houlihan Research Associate UH Lance Fujieki Research Associate UH STAG: Dave Gravett Deck Technician UH-STAG Due to the uncertainty of the availability of the K-O-K we were able to charter the R/V Thomas Thompson which had recently ended a science cruise from San Diego to Honolulu. The charter was on very short notice, the Thompson was four hours into her return to Seattle when we were made aware of her location and the appropriate phone calls and arrangements were made so that the ship could return to Hawaii and help us in our buoy rescue. Thanks to the UH Marine Center, the UW Marine Center, the NSF and the captain and crew of the Thompson for the quick response to our request. The approval was granted in a matter of a few hours, pretty amazing for us here in Hawaii. The Thompson left Pier 2 at approximately 2000 on 26 January with 6 scientists from Hawaii on board. Equipment was also trucked from the Marine Center to the pier to aid in the recovery. We transited overnight and arrived at an intercept point south of the projected drift track at 0600. The flashing navigation light was not visible so we decided to stand off until daybreak to ensure that we did not foul any of the buoy line that might have been on the surface. There was about 1500 m of neutrally buoyant 3/4" nylon line and the same length of positively buoyant 3/4' polypropylene. Captain Gray plotted out a dead reckoning projected location of the buoy from the Argos drift track and at about 0800 the buoy was sighted right where predicted, 22( 44.4'N, 158( 3.24'W. The winds were trades at 20-30 kts, seas rough, swell 8-10 ft, under mostly cloudy skies. Coincidentally the buoy was recovered in Station Aloha after an interesting trip, the track is plotted on the HALE ALOHA homepage: http://hahana.soest.h During the recovery the PVC ring was damaged and at least one anemometer was lost along with possible other instrument damage. Once the buoy was hooked and secured the buoy was towed upwind to limit the possibility of entangling the mooring line in the props. Once in position the buoy was recovered with considerable effort since the bottom metal stand had separated from the float and when the buoy was lifted it slid off the donut-shaped float although the chain, which secured the down-line array, was still attached passing through the float's center hole. The float, which had fallen back into the water, was finally hooked and lifted onto the deck, followed by instrument array. About 1500 m of 5/16" plastic jacketed cable and about 500 m of 3/4" nylon line were recovered. Some of the instruments faired very well, many were lost. One UW Seacat/GTD was totally lost, one was recovered in somewhat damaged condition. One MBARI Nitrate sensor was totally lost, one sustained considerable damage. Although the OSU optical instrument hard had was recovered, the sensor was missing and the glass sphere was shattered. Both MIT trace metal samplers looked in good condition although a few of the individual samplers were damaged. The UH/Karl Seacats were recovered with the external sensors gone. All the UH/Karl thermistors and UH/Lucas Seacats were recovered and looked like they may have sustained some superficial external damage, more will be know as the instruments are inspected closely. The meteorological sensors were a near total loss as was the surface buoy and tower. We are fairly confident that the flotation hardhats and dual releases are in recoverable condition and will be retrieved at an appropriate time. We returned to Pier 2 at 2330 on 27 January where the buoy, gear and The line parted at the termination between the top two 500m nylon sections. The thimble was missing from the upper section and it looked like it was not due to splicing but to some abrasion. It appeared that the damage to the instruments was due to the failure of the stainless bolts that held the base on to the buoy. The buoy had a metal frame made from angle iron that was used to stand the buoy upright while it was on land. This frame was missing upon recovery and it is guessed that as this frame fell through the water column it damaged the instruments and possibly caused the abrasion at the point where the line parted. | |