|
Hawaii Ocean Time-series (HOT)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa |
| » Home » Cruise Schedules, Reports & Cast Sheets » HALE-ALOHA 7A CS Report | |
HALE-ALOHA 7A: Chief Scientist ReportChief Scientist: T. HOULIHANHALE ALOHA 7A/ST8: Chief Scientist Report Chief Scientist: T. Houlihan Vessel: R/V Kaimikai-o-Kanaloa (KOK99-12) Loading: 10 November 1999 Departure: 11 November1999 Arrival: 13 November 1999 Chief Scientist: Terrence Houlihan Master: Captain Robert Hayes Deck Operations: Dave Gravett Electronics Technician: Steve Poulos 1. Science Personnel, HALE ALOHA 7A/ST8 JGOFS group: Lance Fujieki UH Research Associate Terrence Houlihan UH Research Associate Dave Karl UH Scientist Dale Hebel UH Scientist My Christianson UH Student WOCE group: Fernando Santiago UH Research Associate Mark Valenciano UH Research Associate Ancillary projects: Carole Sakomoto MBARI Scientist Peter Williams U. Wales Scientist Chuck Stump UW Scientist Craig Motell UH Student Stag Group: Steve Poulos Electronic Technician Dave Gravett Marine Technician 2. General Summary The loading of the ship for the mooring deployment was conducted on the evening of 10 November after the K-O-K had returned from HOT-109. The ship returned to port at 1715 and we began offloading immediately. Once this was completed we began the loading of the gear for the deployments of the HALE ALOHA mooring and the sediment traps. We stopped at approximately 22:30 due to the long day the crew and scientists had already worked. The loading was completed the following morning and the back deck was subsequently secured. A total of 11 scientists participated in the cruise aboard the R/V Kaimikai-o-Kanaloa . The HALE ALOHA mooring and the moored sediment traps were successfully deployed. Peter Williams, a visiting scientist from the University of Wales, was able to collect water for a high precision respiration incubation experiment which we may develop a long term collaboration if results are promising. Dave Karl also did experimental work as well. 3. Daily Activities 11 November, Thursday We departed Snug Harbor at 0900 and arrived on station for the start of the HALE ALOHA deployment at 1800 and the buoy was overboard at 1805. Mooring deployment went well except for a set of missed cotter pins which required some line to be recovered until the connection problem was corrected. This amounted to a loss of approximately 30 minutes for a total elapsed deployment time of 5:08. 12 November, Friday A water collection CTD cast to 250m was performed followed by a cast to 500m. The sediment trap deployment was started at 1104 and the anchor was dropped at 1258 for an elapsed time of 1:54 and at location 22 49.34 N and 157 52.54 W. A triangulation was performed to determine the location of the sediment trap anchor which was calculated to be 22 49.226 N, 157 52.707 W. A calibration CTD was collected upon return to HALE ALOHA. A three hour CTD yo-yo from 10db to 800bd was started. 13 November, Saturday Returned to Snug Harbor at 1215 and offloaded immediately. | |