»
Home
»
SOEST Ocean Gliders (SOG)
Select a location ...
Overview
» About
» Data
» Photo Gallery
Piloting
» SOG Blog
» Calibration History
» User Guides
SeaGliders
» SG-022
» SG-023
» SG-114
» SG-115
» SG-139
» SG-145
» SG-146
» SG-147
» SG-148
» SG-500
» SG-511
» SG-512
» SG-513
» SG-523
Deployment History:
SOEST SeaGliders
(HiOOS)
Mission 3:
Data
Calibration
sg_calib_constants
Trim
SBE Temp. & Cond.
SBE 43F Oxygen
Health
General
Energy
Location
Plots
T-S
General
Contours
Photos
4/27/12
Recovered S. of Oahu by
Manu O Ku
- spiraling underwater track & poor or spotty comms
- Tiger(?) shark attack (
photos
)!
2/1/12
Deployed S. of Oahu (
HiOOS
)
Jan 11
Refurbished at SOEST Ocean Gliders Facility
Mission 1:
Data
Calibration
sg_calib_constants
Trim
Pressure
SBE Temp. & Cond.
SBE 43F Oxygen
Health
General
Energy
Location
Config.
Plots
Contours
7/29/11
Recovered S. of Oahu by R/V
Klaus Wyrtki
-
deployed: 47 days
6/13/11
Re-deployed S. of Oahu (
HiOOS
)
May 11
Arrived back from iRobot
3/22/11
Recovered S. of Oahu
- "RELAUNCH parameter" problem during first 2 dives.
3/22/11
Deployed S. of Oahu (
HiOOS
)
11/10/10
Arrived from iRobot (NOTE: insurance replacement for
sg114
)