SOEST Ocean Gliders (SOG)
in the School of Ocean and Earth Science and Technology at the University of Hawai'i at Manoa
Home About Data Gliders Photos Model Calibration Guides
114 115 139 145 147


SG139 Deployment History: MIA SeaGliders (SOEST - PacIOOS)

Mission 10: Data Config.
9/14/12 Last known position (via ARGOS):
30.341 N, 166.133 W
5/22/12 Stopped communicating
5/21/12 Deployed S. of Oahu (PacIOOS)
Apr 12 Refurbished at SOEST Ocean Gliders Facility
SG139, mission 10, cruise track
Mission 9: Data Config. Contours
5/26/11 Recovered S. of Oahu by R/V Klaus Wyrtki
- Problem with pitch mechanism
- deployed: 52 days
5/24/11 Went into Recovery mode after dive 436 due to the failure of the linear potentiometer on the pitch mechanism
4/5/11 Deployed S. of Oahu (PacIOOS)
Mar 11 Refurbished at SOEST Ocean Gliders Facility
SG139, mission 9, cruise track
Mission 8: Data Config. Contours
11/10/10 Recovered S. of Oahu by OTG Safe boat
- nearing end of battery life
- deployed: 107 days
7/27/10 Deployed S. of Oahu by Pier 45 Boston Whaler (PacIOOS)
July 10 Refurbished at SOEST Ocean Gliders Facility
SG139, mission 8, cruise track
Mission 7: Data Config. Contours
7/14/10 Recovered off Mamala Bay by Boston Whaler
- nearing end of battery life
- deployed: 94 days
6/13/10 Dive 514: Disabled WET Labs BB2F-VMG sensor (470nm blue, 700nm red & Chloro) to conserve power
4/12/10 Deployed S. of Oahu by Pier 45 Boston Whaler (PacIOOS)
- Test case for "wild life" ARGOS backup positioning device
Oct 09 Arrived back from UW
SG139, mission 7, cruise track
Mission 6: Data Config. Contours
5/28/09 Shipped to UW for evaluation & recalibration
5/22/09 Recovered by Fisherman
- Problem with pitch mechanism. SG couldn't pitch to an angle appropriate for communication.
5/6/09 Lost
- Searched by R/V Klaus Wyrtki. Used pinger to try and get slant range. No response from SG.
5/5/09 Stopped communicating
- deployed: 46 days
3/20/09 Deployed off Barber's Point by Force
(PacIOOS)
SG139, mission 6, cruise track
Mission 3: Data Config. Contours
3/5/09 Replaced GPS & coin cell battery
2/16/09 Recovered off Kahe Point by R/V Kilo Moana during HOT-209
- problem with GPS "engine"
- deployed: 13 days
2/3/09 Deployed off Barber's Point by Force
(PacIOOS)
1/3/09 Arrived back from UW
SG139, mission 3, cruise track
Mission 2: Data Config. Contours
10/21/08 Shipped to UW for recalibration & battery replacement
8/20/08 Recovered by R/V Klaus Wyrtki
- nearing end of battery life
- deployed: 42 days
7/9/08 Deployed S. of Oahu
(PacIOOS)
SG139, mission 2, cruise track
Mission 1: Data Config. Contours
5/5/08 Recovered by Fisherman
- deployed: 14 days
4/21/08 Deployed S. of Oahu
4/9/08 Checkout off Waikiki
12/6/07 Arrived from UW (NOTE: insurance replacement for sg115)
SG139, mission 1, cruise track