HOT-4: Chief Scientist Report
Chief Scientist: S. CHISWELL
HOT-4 Cruise Report
SSP Kaimalino
24-28 Feb. 1989
Personnel List:
---------------
Steve Chiswell Chief Scientist
Chris Winn Senior Scientist
Dave Bird Scientist
Jim Harkness Winch Operator
Dale Hebel Scientist
George Parish Scientist
Stewart Reid Scientist
Marc Rosen Deck Operations
Jef Snyder Electronics Technician
Dave Karl Senior Scientist
Itinerary (approximate local time):
-----------------------------------
24 Feb.
0600 Depart Snug Harbor
0900 Arrive Kahe Pt for two test casts
1200 Depart Kahe Pt
25 Feb.
0200 Arrive HOT-site: deploy sediment traps
0500 Commence 3-hourly CTD casts
27 Feb.
1600 Recover Sediment traps
1900 Depart HOT site
28 Feb.
1200 Arrive Snug Harbor
Narrative:
----------
HOT-4 was the first cruise on the SSP KAIMALINO. The cruise was
initially delayed for one day because the electric current required to
start the hydrographic winch was more than the KAIMALINO's breaker-box
could supply. The self-starter on the winch was eventually bypassed,
and the rest of the cruise was nominal.
|