HOT-22: Chief Scientist Report
Chief Scientist: S. CHISWELL
HOT-22 Cruise Report
R/V Moana Wave
16-20 Dec. 1990
Personnel List:
---------------
Steve Chiswell CS
Chris Winn GOFS
Eric Firing WOCE
Jef Snyder WOCE
F. Bahr
Marc Rosen GOFS/WOCE
Stewart Reid WOCE
John Dore GOFS
Ricardo Letelier GOFS
Dale Hebel GOFS
Jim Christian GOFS
Chuck Stump U.W. Oxygen
J. Lueken Scripps Institute of Oceanography
Cruise Schedule:
----------------
0800 16 Dec. 1990 Depart Snug Harbor
1100 16 Dec. 1990 Arrive Kahe Pt station
1400 16 Dec. 1990 Depart Kahe Pt station
2300 16 Dec. 1990 Arrive ALOHA, deploy sediment traps
0800 20 Dec. 1990 Recover traps, depart Station ALOHA
2000 20 Dec. 1990 Arrive Snug Harbor
Narrative:
----------
HOT-22 departed Snug Harbor at 0800 aboard the R/V Moana Wave on 16
December. Samples were collected en route to Station ALOHA. HOT-22
returned to Snug Harbor at about 1700 on 20 December.
WOCE & JGOFS Sampling
All sampling was completed on HOT-22.
CTD and XBT Operations
Few CTD problems were encountered on HOT-22. However, the hydrowire
kinked during an early cast, producing a gap in our planned CTD burst
sampling. Also, the tensiometer was not working on HOT-22. The CTD
decent speeds were therefore decreased to avoid additional hydrowire
kinks. Consequently, the CTD burst sampling interval was increased.
XBTs were deployed on the return leg from Station ALOHA to Snug
Harbor.
Primary Production and Sediment Trap Measurements
Primary production was measured on HOT-22 with 12-hour in situ
incubations. Sediment traps were deployed and recovered on HOT-22
without significant problems.
Lowered ADCP Operations
Four lowered ADCP casts were conducted on HOT-22.
Optical Measurements
Optical casts were completed at Kahe Point.
Ancillary projects
Samples for dissolved gases were collected for Charles Keeling of
Scripps and for Steve Emerson and Paul Quay of the University of
Washington.
|